CUMULATIVE LISTING OF ARTICLES FROM CCL SUMMARIES 1994 - 2001

Welcome to the CCL Summaries Archives. Articles summarizing the advances and changes in Technology, Law, Insurance and Accounting that affect your profession and your business are available upon request. Submit your request by area of interest.

ACCELERATION

Agreements
Agreements to Accelerate Vol. 5 No. 8 August 1998
Labor Productivity Vol. 7 No. 8 August 2000

ACCOUNTING

Construction
Management Taxability Vol. 2 No. 6 June 1995

Contractors
New Programs Vol. 2 No. 2 February 1995

Financial Conditions
Evaluating Conditions Vol. 3 No. 5 May 1996

Market
Design Vol. 1 No. 1 October 1994

BIDDING

Business
Disadvantage Business Enterprises Vol. 4 No. 6 June 1997

Model
Bidding Model for Bid Preparation Vol. 5 No. 4 April 1998

Protests
Payment for Contractors Who Proceed Vol. 5 No. 5 May 1998

CHANGES

Agreements
Administration Vol. 7 No. 3 March 2000
Liquidating Agreements Vol. 5 No. 12 December 1998
Oral Modifications Vol. 7 No. 6 June 2000
Unilateral Modifications Vol. 7 No. 6 June 2000
Written Changes Vol. 8 No. 4 April 2001

Disruptions
Calculating Disruptions Vol. 5 No. 12 December 1998

Project
Cardinal Changes Vol. 8 No. 4 April 2001
Cumulative Impact Vol. 7 No. 6 June 2000
Effect on Budget and Schedule Vol. 4 No. 9 September 1997
Effect of Multiple Changes Vol. 7 No. 1 January 2000

Termination
Termination for Convenience Vol. 5 No. 12 December 1998

CHANGE ORDERS

Authority
Releases Vol. 7 No. 2 February 2000

Changes
DCAA Audit Manual Revisions Vol. 6 No. 1 January 1999
Cardinal Changes Vol. 6 No. 2 February 1999

Commercial
Commercial Impracticability Vol. 6 No. 2 February 1999

Construction
Avoiding Vol. 5 No. 5 May 1998
Change Control System Vol. 3 No. 6 June 1996
Cost of Change Vol. 3 No. 2 February 1996
Effect on Productivity Vol. 3 No. 9 September 1996
Setting Aside A Modification Vol. 3 No. 6 June 1996

Costs
Accord and Satisfaction Vol. 7 No. 10 October 2000
Change Order Markup Vol. 6 No. 1 January 1999
Overhead Vol. 5 No. 7 July 1998
Sovereign Immunity Vol. 7 No. 9 September 2000
Special Time Cards for Additional Costs Vol. 6 No. 1 January 1999

Delay
Cumulative Delay Claims Vol. 3 No. 9 September 1996
Duress Vol. 7 No. 9 September 2000
Oral Agreements at Time of Change Order Vol. 4 No. 9 September 1997

Economy
Economic Duress Vol. 6 No. 3 March 1999

Government
Funding Vol. 4 No.4 April 1997

Multiple
Too Many Changes Vol. 5 No. 7 July 1998

Payment
Change Orders Vol. 8 No. 1 January 2001

Performance
Recordkeeping Vol. 6 No. 3 March 1999

Productivity
Effect on Productivity Vol. 5 No. 6 June 1998

Project Administration
Change Order Management Systems Vol. 3 No. 5 May 1996

Termination
Practical Advice Federal Govt. Convenience Clause Vol. 5 No. 2 February 1998
Termination Expenses Vol. 6 No. 1 January 1999
Termination or Modification? Vol. 5 No. 1 January 1998

CLAIMS

Construction
Differing Site Conditions Vol. 4 No. 6 June 1997
Differing Site Conditions Vol. 7 No. 10 October 2000
Differing Site Conditions Vol. 7 No. 12 December 2000
Differing Site Conditions Vol. 8 No. 3 March 2001

Contractor
Assignment Vol. 7 No. 10 October 2000
Contractor - False Claims Vol. 4 No. 5 May 1997
False Certification Vol. 3 No. 3 March 1996
False Claims Vol. 4 No. 7 July 1997
False Claims Vol. 5 No. 9 September 1998
False Claims Act Vol. 4 No. 3 March 1997
Silence is the Best Report Vol. 5 No. 4 April 1998
Time to Submit a Claim Vol. 8 No. 3 March 2001

Costs
Allowability of Consultant Costs Vol. 2 No. 6 June 1995
Costs of Borrowing Vol. 5 No. 3 March 1998
Overhead Vol. 5 No. 7 July 1998

Disruption
Cumulative Impact Vol. 4 No. 8 August 1997

False Claims
False Claims Vol. 6 No. 3 March 1999

Law
False Claims Vol. 3 No. 6 June 1996
Lien Vol. 7 No. 11 November 2000
Notice Vol. 7 No. 3 March 2000
Notice - Owner's Bad Faith Vol. 5 No. 4 April 1998

Multiple
Multiple Vol. 5 No. 7 July 1998

Productivity
Labor Productivity Vol. 3 No. 9 September 1996
Lost Productivity Vol. 7 No. 5 May 2000

Specifications
Defective Vol. 3 No. 4 April 1996

Subcontractor
Extra Work Vol. 8 No. 5 May 2001

CONSTRUCTION

Change Orders
Change Orders Release Not Preclude Additional Claim Vol. 3 No. 10 October 1996

Claims
Claims Vol. 6 No. 4 April 1999
Differing Site Conditions Vol. 3 No. 10 October 1996
Differing Site Conditions Vol. 5 No. 1 January 1998

Construction Contracts
Environmental Vol. 5 No. 9 September 1998

Construction Management
Contractor Warranty Vol. 2 No. 8 August 1995
Marketing CM Services Vol. 2 No. 7 July 1995
Professional Service Vol. 2 No. 6 June 1995

Contractors
A New Roadblock to Claims Vol. 2 No. 10 October 1995
Acquisition or Merger Vol. 2 No. 13 Supplement 1995
Affirmative Action Vol. 2 No. 8 August 1995
Affirmative Action Vol. 3 No. 5 May 1996
Affirmative Action Vol. 5 No. 4 April 1998
Building Codes Vol. 2 No. 8 August 1995
CAD's Accuracy Vol. 2 No. 7 July 1995
CFMA 1994 Construction Industry Survey Vol. 2 No. 1 January 1995
Design/Build Vol. 2 No. 8 August 1995
Determining Impact Before the Change Vol. 2 No. 10 October 1995
Managing Change Notices - Nice Guys Finish Last Vol. 2 No. 4 April 1995
Negotiated Procurement Vol. 3 No. 11 November 1996
New Ways to Determine Time to Perform Vol. 2 No. 11 November 1995
Profitability Vol. 2 No. 1 January 1995
Risk - Allocation of Risk Vol. 4 No. 5 May 1997
Risk Management Vol. 8 No. 1 January 2001
Subcontracts Vol. 4 No. 2 February 1997
Withholding Subcontractor Payment Vol. 8 No. 2 February 2001
Worker's Compensation Vol. 7 No. 6 June 2000

Contracts
A201 (1997) Vol. 5 No. 3 March 1998
Sovereign Immunity Vol. 3 No. 12 December 1996

Costs
Cost Estimates Vol. 8 No. 4 April 2001
Costs of Borrowing Vol. 5 No. 3 March 1998
Inflationary Cost Increases in '93-'94 Vol. 1 No. 1 October 1994
Polyvinyl Chloride (PVC) Vol. 1 No. 1 October 1994

Environment
Cold and Hot Weather Concrete Vol. 5 No. 4 April 1998
Insurance Risk Vol. 2 No. 4 April 1995
Insurance Risk Vol. 3 No. 7 July 1996
Lender Liability - Hazardous Waste Vol. 4 No. 2 February 1997
New Water Regulations Vol. 2 No. 3 March 1995
Winter Concrete Vol. 5 No. 3 March 1998

Equipment
Buy or Lease? Vol. 2 No. 2 February 1995
Crane Selection Vol. 2 No. 3 March 1995
Prefabrication for Multi-Stories Vol. 3 No. 2 February 1996

Financing
Fund Administration Vol. 8 No. 4 April 2001
Lender's Liability for Progress Payments Vol. 2 No. 8 August 1995
Public-Private Financing Vol. 2 No. 10 October 1995

Future
Construction Predictions Vol. 3 No. 1 January 1996
Predictions for 1995 Vol. 2 No. 13 Supplement 1995

Hospitals
Health Care Reform Delays New Construction Vol. 1 No. 3 December 1994

Housing
Construction Market Vol. 2 No. 3 March 1995
P
rivatized Housing Vol. 8 No. 2 February 2001

International
Asia's Power Market Vol. 2 No. 12 December 1995
Global Building Vol. 2 No. 2 February 1995
Growth Vol. 2 No. 1 January 1995
International Market Vol. 3 No. 11 November 1996
International Merger Vol. 2 No. 2 February 1995

New Products
Fiber-Reinforced Glulam Vol. 1 No. 1 October 1994

Owners
Selecting Project Delivery System Vol. 3 No. 4 April 1996
Selecting the Contractor Vol. 2 No. 1 January 1995
Subcontractors - DBE Set Asides Vol. 2 No. 4 April 1995
Termination - Subcontractors Vol. 2 No. 8 August 1995

Planning
Excavation: Directional Boring Vol. 2 No. 4 April 1995
Formwork Vol. 1 No. 1 October 1994
Formwork Vol. 2 No. 4 April 1995
Risk Assessment Vol. 3 No. 10 October 1996

Project Administration
Contractor Selection/Designer Selection Vol. 3 No. 4 April 1996
Labor Shortages Vol. 2 No. 3 March 1995
Welder Shortages Vol. 2 No. 6 June 1995

Projects
Seven Oaks Dam Vol. 3 No. 2 February 1996

Requirements
Buried Utilities Vol. 7 No. 12 December 2000
New Steel Erection Standards Vol. 8 No. 4 April 2001
Submittal Approval Vol. 8 No. 4 April 2001
Technology Centers Vol. 2 No. 12 December 1995

Safety
Crumbling Bridges in the U.S Vol. 3 No. 1 January 1996
Highway Work Zones Vol. 2 No. 7 July 1995
Profit Vol. 2 No. 6 June 1995
Radar Transmitters Vol. 2 No. 7 July 1995
Safety Programs Vol. 2 No. 6 June 1995

Sources
Risk - Classification and Sources Vol. 4 No. 2 February 1997

CONSTRUCTION MANAGEMENT

Liability
CM Liability Vol. 6 No. 3 March 1999

Modifications
Authority to Modify Trade Contracts Vol. 7 No. 4 April 2000
Web Sites Vol. 7 No. 10 October 2000

CONTRACTS

Agreement
Incorporation By Reference Vol. 3 No. 11 November 1996

Clauses
Pay If Paid Clauses Vol. 3 No. 6 June 1996
Pay If Paid Clause Unenforceable Vol. 5 No. 4 April 1998
Time is of the Essence Vol. 8 No. 3 March 2001

Compensation
Contractor Compensation Vol. 6 No. 3 March 1999
Contractor Compensation Vol. 6 No. 4 April 1999
Contractor Compensation Vol. 6 No. 5 May 1999
Contractor Compensation Vol. 6 No. 6 June 1999
Contractor Compensation Vol. 6 No. 7 July 1999

Damages
Mutual Waiver of Consequential Damages Vol. 5 No. 3 March 1998

Default
Performance Bonds - Notice of Default Vol. 1 No. 3 December 1994

Design
AIA B141 Vol. 5 No. 5 May 1998
Construction/Design - New AIA Form Vol. 4 No. 6 June 1997
Design/Build Vol. 2 No. 10 October 1995
Hold Harmless Agreements Vol. 2 No. 1 January 1995
New FIDIC Subcontractor Form Vol. 2 No. 6 June 1995

Government
Government Contracts Decisions Vol. 4 No. 9 September 1997
Government Subcontracts Vol. 6 No. 9 September 1999

Guides
Design/Build Vol. 2 No. 4 April 1995

Interpretation
Interpretation Vol. 6 No. 4 April 1999

Performance
Contractor Compensation Vol. 6 No. 9 September 1999

Subcontractors
New AGC Subcontract Form Vol. 1 No. 3 December 1994

DAMAGES

Calculations
Eichleay Formula Vol. 1 No. 1 October 1994
Eichleay Formula Vol. 3 No. 2 February 1996
Eichleay Formula Vol. 3 No. 8 August 1996
Eichleay Formula Vol. 5 No. 6 June 1998

Costs
Proving Labor Costs Vol. 8 No. 2 February 2001

Cost Control
Additional Costs Vol. 7 No. 11 November 2000
Lost Productivity Vol. 4 No. 4 April 1997

Delays
Eichleay Formula Vol. 7 No. 11 November 2000
Home Office Overhead Vol. 4 No. 5 May 1997

Economy
Economic Loss - Other Property Vol. 4 No. 4 April 1997

Prejudgment Interest
Court Ruling Saves Interest Vol. 2 No. 4 April 1995

Project Management
Lost Productivity Vol. 4 No. 8 August 1997

Recovery
Owner Cannot Recover Liquidated and Actual Vol. 3 No. 4 April 1996
Recovering Attorney Fees Vol. 3 No. 3 March 1996
Recovering Attorney Fees and Interest Vol. 3 No. 1 January 1996

DEFECTS

Arbitration
Home Buyer's Warranty Vol. 3 No. 12 December 1996
Homeowners Warranty Arbitration Vol. 2 No. 13 Supplement 1995
Scope of Agreement Vol. 8 No. 3 March 2001

Associations
Homeowner's Associations Unique Characteristics Vol. 2 No. 4 April 1995

Bonds
Surety's Obligation To Investigate Defects Vol. 2 No. 9 September 1995

Calculation of Damages
Diminutive Value Vol. 2 No. 6 June 1995
Causes of Construction Defects Vol. 2 No. 9 September 1995
Dry Rot Vol. 5 No. 5 May 1998
Labor Shortages Vol. 2 No. 6 June 1995
Maintenance or Defect? Vol. 2 No. 9 September 1995
Need To Disclose Off-Site Conditions Vol. 2 No. 9 September 1995
Roof Leaks Vol. 2 No. 2 February 1995
Scupper Construction Vol. 2 No. 12 December 1995
Sick Building Vol. 7 No. 3 March 2000
Sick Building Syndrome Vol. 2 No. 3 March 1995
Sick Building Syndrome Vol. 7 No. 6 June 2000
Sick Building Syndrome Vol. 7 No. 11 November 2000
Weather Protection Vol. 2 No. 9 September 1995

Claims
Cause v. Symptom Vol. 1 No. 3 December 1994
Defect Claims to Increase Vol. 2 No. 9 September 1995
Denying Contractor Claims Vol. 8 No. 2 February 2001
Insurance Vol. 1 No. 2 November 1994
Statutes of Repose Vol. 4 No. 3 March 1997
Vinyl Tile Vol. 1 No. 3 December 1994
Warranty Vol. 1 No. 3 December 1994

Codes
City's Enforcement of Building Codes Vol. 2 No. 9 September 1995

Concrete
Concrete Vol. 6 No. 10 October 1999
Post Tensioned Concrete Slabs Vol. 6 No. 3 March 1999
Post Tensioned Slabs Vol. 7 No. 11 November 2000
Stone Veneer Slabs Vol. 5 No. 2 February 1998
Testing for Defects Vol. 2 No. 2 February 1995
Testing for Defects Vol. 2 No. 7 July 1995

Concrete Cracks
Calcium Chloride Vol. 2 No. 3 March 1995

Damages
Damages for Emotional Distress Vol. 7 No. 3 March 2000
Damage to Other Property Vol. 5 No. 12 December 1998
Damage to Other Property Vol. 6 No. 1 January 1999
Storm Damage Vol. 3 No. 12 December 1996

Design
Lateral Support Vol. 7 No. 2 February 2000
Masonry Failure Vol. 6 No. 4 April 1999

Documents
Claim Documents Vol. 2 No. 3 March 1995
Incorporation Doctrine Vol. 5 No. 6 June 1998

Experts
Proving Designer Malpractice Vol. 3 No. 7 July 1996

Government
Latent Defects Vol. 5 No. 2 February 1998
Latent Defects Vol. 5 No. 12 December 1998

Guide
Guide To Defect Claims and Litigation Vol. 2 No. 9 September 1995

Homeowner's Warranty
Receivership Vol. 2 No. 2 February 1995
Roof Leaks Vol. 7 No. 12 December 2000

Inspection
Independent Inspection and Concealed Defects Vol. 5 No. 11 November 1998

Insurance
Additional Insured Endorsements Vol. 8 No. 3 March 2001
CGL Insurance Vol. 6 No. 5 May 1999
CGL Insurance Coverage Vol. 6 No. 6 June 1999
CGL Insurers Share Continuous Loss Vol. 2 No. 9 September 1995
Commercial General Liability Insurance Vol. 3 No. 9 September 1996
Insurance Vol. 5 No. 12 December 1998
Insurance Vol. 8 No. 1 January 2001
Insurance Coverage Vol. 8 No. 2 February 2001
Insurance to Correct Vol. 5 No. 9 September 1998
Insurance to Pay For Corrections Vol. 4 No. 2 February 1997
Insurance to Pay For Repairs
Vol. 4 No. 1 January 1997

Latent Defects
Latent Defects Vol. 6 No. 2 February 1999
Time to Claim Vol. 7 No. 10 October 2000

Legislation
New California Community Association Law Vol. 3 No. 1 January 1996
New Defect Legislation - Bad for Association? Vol. 2 No. 10 October 1995
New Defect Legislation - Good for Association? Vol. 2 No. 10 October 1995
Proposed California Legislation Vol. 3 No. 5 May 1996
Time Limits on Lawsuits Vol. 3 No. 7 July 1996

Liability
Building Inspectors Vol. 3 No. 11 November 1996
Contractor Warrants Designer's Defective Plans Vol. 2 No. 9 September 1995
Designer Liability Vol. 3 No. 10 October 1996
Designers Liable for Contractor's Defective Work Vol. 2 No. 9 September 1995
Engineer Liable To Contractor Vol. 2 No. 9 September 1995
Homebuilders Strictly Liable For Defects Vol. 2 No. 1 January 1995
Lender Liability Vol. 6 No. 8 August 1999
Liability for Inspection Vol. 6 No. 1 January 1999
Real Estate Broker Liability Vol. 2 No. 5 May 1995
Supplier Liability Vol. 7 No. 10 October 2000

Limitations
of Actions: Statutes of Repose Vol. 2 No. 9 September 1995
on Actions Measured from Final Completion Vol. 2 No. 8 August 1995
Statute of Limitations
Vol. 4 No. 1 January 1997
Statute of Limitations Vol. 7 No. 5 May 2000
Statute of Repose Vol. 8 No. 5 May 2001

Litigation
Avoiding Litigation Vol. 6 No. 5 May 1999
Buyers Knowledge of Defect Litigation Vol. 4 No. 12 December 1997
Case Management Orders Vol. 3 No. 7 July 1996
Forensic Investigation Vol. 4 No. 11 November 1997
Incorporation Doctrine Vol. 5 No. 6 June 1998
Reserve Study Requirements Vol. 4 No. 12 December 1997

Materials
EIFS Vol. 3 No. 9 September 1996
EIFS Systems Vol. 3 No. 7 July 1996
EIFS Systems Vol. 3 No. 7 July 1996
EIFS Systems Vol. 3 No. 11 November 1996
Indoor Air Quality Vol. 3 No. 11 November 1996
Indoor Air Quality Vol. 4 No. 3 March 1997
Polybutlylene Pipe Vol. 3 No. 2 February 1996
Polybutlylene Pipe Vol. 2 No. 12 December 1995
Polybutlylene Pipe Vol. 5 No. 4 April 1998
Wood Siding Vol. 2 No. 11 November 1995

Measuring
Measuring Reinforcing Steel Corrosion Vol. 2 No. 13 Supplement 1995

Owner Damages
Betterment Vol. 3 No. 2 February 1996
Cost of Replacement Vol. 3 No. 3 March 1996
Owner Damages Vol. 7 No. 3 March 2000
Subsequent Owners Vol. 7 No. 6 June 2000

Prevention
Defect Prevention in Shear Wall Construction Vol. 3 No. 3 March 1996

Quality
Designer Quality Vol. 2 No. 11 November 1995
Indoor Air Quality Vol. 6 No. 7 July 1999
Indoor Air Quality Defects Vol. 2 No. 9 September 1995
Quality of Work Vol. 2 No. 13 Supplement 1995

Quality Control
Avoiding - Quality Control Vol. 2 No. 5 May 1995

Remedy
Fraud Vol. 6 No. 6 June 1999

Repair
Epoxy Adhesives Vol. 2 No. 2 February 1995
Foundation Wall Repair Vol. 2 No. 4 April 1995
Observing Repairs Vol. 8 No. 2 February 2001
Reconstruction Vol. 2 No. 6 June 1995

Wood
Wood Floor Deflection Vol. 2 No. 9 September 1995

DELAYS

Cardinal Changes
Re-negotiating Contract Price Vol. 2 No. 2 February 1995

Changes
Claims-Schedule Analysis Vol. 4 No. 12 December 1997

Claims
CPM Inappropriate for Multiple Room Project Vol. 1 No. 2 November 1994
Claims-Eichleay Formula Vol. 4 No. 2 February 1997
Collapsed As-Built Vol. 3 No. 6 June 1996
Computer Evidence Vol. 3 No. 3 March 1996
Contractor Duration Vol. 8 No. 1 January 2001
Eichleay Formula Vol. 2 No. 5 May 1995
Eichleay Formula Vol. 3 No. 5 May 1996
Eichleay Formula Vol. 3 No. 10 October 1996
Eichleay Formula Vol. 3 No. 11 November 1996
Eichleay Formula Vol. 4 No. 9 September 1997
Eichleay Formula Vol. 6 No. 4 April 1999
Eichleay Formula Vol. 7 No. 5 May 2000
Eichleay Formula Vol. 7 No. 11 November 2000
Export Examination Vol. 7 No. 2 February 2000
Home Office Overhead Vol. 7 No. 12 December 2000
Liability Vol. 7 No. 11 November 2000
Network Schedules to Prove Delay Vol. 1 No. 1 October 1994
Notice Vol. 7 No. 12 December 2000
Schedule Evaluation Vol. 7 No. 2 February 2000
Starting Work Vol. 8 No. 5 May 2001
Subcontractor Responsibility for Delay Vol. 1 No. 3 December 1994
Sureties Vol. 3 No. 11 November 1996
Weather Vol. 7 No. 3 March 2000

Concurrent
Apportioning Concurrent Delays Vol. 3 No. 8 August 1996
Concurrent Delay Vol. 7 No. 8 August 2000
Concurrent Delay Vol. 7 No. 9 September 2000
Concurrent Delay Vol. 8 No. 2 February 2001

Costs
Bid Protests Vol. 3 No. 4 April 1996
Cost Escalation Vol. 7 No. 12 December 2000
Delay Costs Under Payment Bond Vol. 3 No. 4 April 1996
Lost Profits Vol. 6 No. 9 September 1999

Exceptions
No Damage For Delay Vol. 3 No. 3 March 1996

International
English Power Plants Vol. 2 No. 10 October 1995
U.K. Claims Vol. 4 No. 12 December 1997
London Underground Vol. 5 No. 11 November 1998

Liability
Liquidated Damages Vol. 7 No. 9 September 2000
Payment Bond Vol. 6 No. 2 February 1999

Methods
Claims Vol. 8 No. 5 May 2001
Comparing Delay Analysis Methods Vol. 7 No. 1 January 2000
Measurement Vol. 7 No. 9 September 2000
Measuring Delay Vol. 4 No. 6 June 1997
Proving Delay Vol. 7 No. 10 October 2000
Responsibility Vol. 7 No. 9 September 2000

Overhead
Home Office Overhead Vol. 6 No. 1 January 1999
Home Office Overhead Vol. 6 No. 7 July 1999
Home Office Overhead Vol. 6 No. 8 August 1999

Recovery
Claims Against the Surety Vol. 4 No. 10 October 1997
Lost Productivity Vol. 6 No. 8 August 1999
Time Only Provision No Bar to Delay Damages Vol. 4 No. 3 March 1997

Specifications
Defective Cardinal Change Vol. 2 No. 4 April 1995

Sureties
Claims - Sureties Vol. 4 No. 2 February 1997

DESIGN

Beams
Bending Stiffness of Wood Beams Vol. 2 No. 11 November 1995

Building Codes
Earthquake Results to Change Seismic Design in Building Codes Vol. 1 No. 1 October 1994
Building Codes Vol. 8 No. 4 April 2001
Building Collapse - Northridge Earthquake Vol. 2 No. 2 February 1995

CAD
CAD Drawings Vol. 2 No. 12 December 1995
Four Dimensional Modeling Vol. 2 No. 7 July 1995

Computer Software
3D Modeling Vol. 2 No. 13 Supplement 1995

Computer Systems
Automation Vol. 2 No. 8 August 1995

Concrete
Protecting Concrete From Corrosion Vol. 2 No. 10 October 1995
Reinforced Concrete Beams Vol. 2 No. 7 July 1995

Constructability
Americans With Disabilities Act Vol. 3 No. 4 April 1996
Americans With Disabilities Act Vol. 4 No. 11 November 1997
Americans With Disabilities Act Vol. 5 No. 5 May 1998
Americans With Disabilities Act Vol. 5 No. 6 June 1998
Americans With Disabilities Act Vol. 5 No. 11 November 1998
Americans With Disabilities Act Vol. 7 No. 12 December 2000
Human Habitation or Use Vol. 2 No. 12 December 1995

Construction Management
Architects Vol. 2 No. 3 March 1995

Contractors
Statute of Limitations Vol. 2 No. 12 December 1995

Contracts
Contracts for Design Services Vol. 2 No. 11 November 1995
Statute of Limitations Vol. 2 No. 12 December 1995

Design/Build
1996 AIA Standard Form Design-Build Agreements Vol. 3 No. 12 December 1996
Designer License Vol. 3 No. 12 December 1996
Incentive Contracts Vol. 3 No. 12 December 1996
Indemnity Agreements Vol. 3 No. 9 September 1996
Joint Venture Contracts Vol. 3 No. 10 October 1996
Practice Manual Vol. 3 No. 11 November 1996
Proposed Exceptions to Federal Rule Vol. 3 No. 12 December 1996
Public Agencies Vol. 2 No. 4 April 1995
State Laws Vol. 3 No. 9 September 1996
State and Local Law Vol. 3 No. 11 November 1996
Total Incentive Contracts Vol. 3 No. 9 September 1996

Highways
Need to Consult Traffic Engineer Vol. 2 No. 5 May 1995
Road Pavements Vol. 3 No. 1 January 1996

International
Waste and Water Market Vol. 2 No. 1 January 1995

Law
Certificate of Merit Laws Vol. 4 No. 12 December 1997
New Federal Law Vol. 3 No. 4 April 1996

Measurement
Metric - U.S. Conversion Vol. 2 No. 3 March 1995

Methods
Reinforced Concrete Beam Deflection Vol. 1 No. 2 November 1994

New Products
Cardboard Vol. 4 No. 3 March 1997
Innovative Designs Vol. 7 No. 6 June 2000
Innovative Steel Deck Vol. 2 No. 2 February 1995
Moisture Protection Vol. 1 No. 2 November 1994

Panel
Panel Use Vol. 2 No. 7 July 1995

Project Administration
Moisture Protection - Weather Envelope Vol. 1 No. 3 December 1994

Reinforcing Steel
Rust Resistant Re-Bar Vol. 2 No. 5 May 1995

Review
Designers Operations Review Vol. 2 No. 7 July 1995
Review Electronic Stamps Vol. 5 No. 6 June 1998

Roof Sheets
Wind Pulls Sheets From Fasteners Vol. 2 No. 6 June 1995

Safety
Zero Accident Culture Vol. 2 No. 7 July 1995

Seismic Design
Columns Design Vol. 3 No. 5 May 1996
Hospitals Vol. 2 No. 10 October 1995

Structural Panels
Plywood or OSB? Vol. 2 No. 2 February 1995

Structure
Bridges Vol. 4 No. 7 July 1997

Termination
Terminating the Design Contract Vol. 5 No. 10 October 1998

Trend
Silent Trend Vol. 3 No. 3 March 1996

DESIGN/BUILD

Agreements
Teaming Agreements Vol. 6 No. 9 September 1999

Change Orders
Change Orders Vol. 4 No. 12 December 1997
No Written Change Orders Vol. 5 No. 11 November 1998

Claims
Joint Venture Claims Vol. 6 No. 8 August 1999

Construction
Risk Vol. 4 No. 9 September 1997

Contracts
Authority to Contract Vol. 6 No. 6 June 1999
Contracts Vol. 5 No. 7 July 1998
Contracts Vol. 5 No. 9 September 1998
Form Contracts Vol. 7 No. 2 February 2000
GMP - Innovative Projects Vol. 4 No. 6 June 1997

Costs
Compared Vol. 6 No. 2 February 1999
Reimbursable Costs Vol. 5 No. 8 August 1998

Engineers
How to Lead Design/Build Teams Vol. 5 No. 4 April 1998

Government
Federal Selection Vol. 5 No. 8 August 1998
Government Contractor Defense Vol. 4 No. 10 October 1997
Increased Federal Projects Vol. 5 No. 5 May 1998

Laws
Procurement Vol. 4 No. 3 March 1997
State Surveys Vol. 4 No. 1 January 1997

Lenders
Lenders Obligation to Fund Vol. 5 No. 10 October 1998

Liability
Designer Liability Vol. 4 No. 5 May 1997
Lump Sum Liability Vol. 5 No. 12 December 1998

Methods
Problems Vol. 4 No. 7 July 1997
Volumetric Building Technique Vol. 5 No. 1 January 1998

Ownership
Design Ownership Vol. 5 No. 10 October 1998

Proposals
Bid Protests Vol. 4 No. 11 November 1997
Request for Proposals Vol. 4 No. 3 March 1997
Successful Case History Vol. 5 No. 2 February 1998

Specifications
Scope of Work Vol. 5 No. 11 November 1998
Specifications Vol. 5 No. 8 August 1998

Trade Secrets
Trade Secrets Vol. 5 No. 10 October 1998

DESIGNER

Arbitration
No Arbitration for Professional Negligence Vol. 3 No. 11 November 1996

Architect
Americans With Disabilities Act Vol. 3 No. 12 December 1996
Americans With Disabilities Act Vol. 4 No. 3 March 1997
Americans With Disabilities Act Vol. 4 No. 4 April 1997
Americans With Disabilities Act Vol. 5 No. 1 January 1998
Americans With Disabilities Act Vol. 5 No. 4 April 1998
Architect as Builder Vol. 2 No. 7 July 1995

Caps
Overhead Vol. 3 No. 2 February 1996

Change Orders
Designer's Change Orders Vol. 2 No. 8 August 1995

Claims
Claims Against Vol. 5 No. 3 March 1998
Claims By ... Vol. 4 No. 3 March 1997
Entitlement To Offset Vol. 7 No. 12 December 2000

Communication
Implied Obligation Vol. 7 No. 1 January 2000
Importance of Communication Vol. 2 No. 5 May 1995

Construction
Construction Safety Vol. 3 No. 11 November 1996
Marketing Forecast Vol. 3 No. 6 June 1996
Contracts Vol. 4 No. 1 January 1997

Contractors
Project Administration - Terminating Contractors Vol. 4 No. 8 August 1997
Project Administration - Terminating Contractors Vol. 4 No. 9 September 1997

Contracts
Contracts Vol. 3 No. 1 January 1996
Designer Contracts Vol. 2 No. 10 October 1995

Copyrights
Design Copyright Vol. 5 No. 8 August 1998

Design/Build
Advantages Vol. 3 No. 8 August 1996
Federal Government Projects Vol. 3 No. 8 August 1996
Project Performance Vol. 3 No. 8 August 1996
Reimburse Unsuccessful Offerers? Vol. 3 No. 8 August 1996

Designs
Delegating Design to the Contractor Vol. 5 No. 11 November 1998
Reusing Designs Vol. 4 No. 9 September 1997
Reusing Designs Vol. 4 No. 10 October 1997

Documentation
Certified Pay Requests Vol. 7 No. 3 March 2000
Project Administration Vol. 1 No. 1 October 1994
Recordkeeping Vol. 7 No. 5 May 2000

Draftsmen
Unauthorized Engineering Practice Vol. 8 No. 2 February 2001

Engineers
Engineers Cannot Design for Habitation or Occupancy Vol. 2 No. 4 April 1995

Insurance
Standard of Care Vol. 7 No. 4 April 2000

International
International Market Vol. 2 No. 13 Supplement 1995

Lawsuits
Avoiding Professional Liability Lawsuits Vol. 2 No. 2 February 1995
Contractor's Lawsuits Vol. 3 No. 2 February 1996

Legal
Indemnification Vol. 2 No. 8 August 1995
Ownership of Design Vol. 3 No. 1 January 1996

Liability
Architect Liability Vol. 7 No. 10 October 2000
Dismissal With Prejudice Vol. 7 No. 10 October 2000
Liability Claims Against Vol. 1 No. 3 December 1994
Liability for Differing Site Conditions Vol. 7 No. 4 April 2000
Liability for Negligence Vol. 7 No. 1 January 2000
Liability for Site Visits Vol. 7 No. 5 May 2000
Liability for Unauthorized Changes Vol. 2 No. 3 March 1995
Liability to Third Parties Vol. 4 No. 2 February 1997
Limitation of Liability Vol. 4 No. 1 January 1997
Limitation of Liability Vol. 4 No. 2 February 1997
Limitation of Liability Clauses Vol. 3 No. 12 December 1996
Limiting Liability Vol. 2 No. 8 August 1995

Litigation
Litigation - Experts Vol. 5 No. 1 January 1998

Management
Insurance Costs Vol. 3 No. 2 February 1996
Insurance Costs Vol. 3 No. 7 July 1996
Insurance Costs Vol. 5 No. 4 April 1998
Management Insurance Cost Vol. 4 No. 4 April 1997
Risk Management Vol. 6 No. 2 February 1999
Small Firm Organization Vol. 3 No. 3 March 1996

Marketing
Billings Vol. 3 No.6 June 1996

Project Administration
Liability Claims Against Vol. 1 No. 3 December 1994
Making A Decision Vol. 1 No. 2 November 1994
Program Management Vol. 3 No. 12 December 1996
Project Administration - Failure to Make a Decision Vol. 4 No. 12 December 1997

Review
Constructability Design and Specification Review Vol. 2 No. 3 March 1995

Safety
Construction Site Safety: Whose Job is it Anyway? Vol. 5 No. 5 May 1998
Liability for Safety Vol. 7 No. 1 January 2000
Site Safety - Rights, Risks & Responsibilities Vol. 5 No. 5 May 1998

Selection
Selecting Designers Vol. 2 No. 8 August 1995

Top 500
Marketing Vol. 2 No. 13 Supplement 1995

DISCOVERY

Alternate Dispute Resolution
ADR Documents Vol. 2 No. 10 October 1995

Arbitration
Arbitration Vol. 5 No. 7 July 1998
Arbitrator Power To Order Depositions Vol. 2 No. 10 October 1995
Discovery Vol. 2 No. 1 January 1995
Discovery Vol. 2 No. 2 February 1995

Billing
Attorney Billing Records Vol. 6 No. 8 August 1999
Freedom of Information Act Vol. 7 No. 5 May 2000

Experts
Court Appointed Experts Vol. 7 No. 8 August 2000
Damage Experts Vol. 2 No. 5 May 1995
Deposing an Expert Vol. 4 No. 10 October 1997
Deposing Owners Attorney Vol. 7 No. 12 December 2000
Expert Opinions Vol. 8 No. 2 February 2001
Expert Reports Vol. 3 No. 10 October 1996
Expert Testimony Vol. 5 No. 8 August 1998

Legal
Abuse Vol. 4 No. 8 August 1997
ADR Discovery Under the Freedom of Information Act Vol. 2 No. 11 November 1995
Contentious Discovery Vol. 2 No. 11 November 1995
Reform Vol. 2 No. 5 May 1995

Litigation
Document Imaging Vol. 1 No. 3 December 1994
Expert Discovery in Government Litigation Vol. 5 No. 11 November 1998
Litigation Support Systems Vol. 3 No. 6 June 1996

Nonparty
Evidence From Nonparties Vol. 6 No. 7 July 1999
Nonparty Discovery Vol. 4 No. 12 December 1997

Party
Interviewing Party Employees Vol. 5 No. 6 June 1998

Privilege
E-Mail Vol. 3 No. 9 September 1996
Executive Privilege Vol. 6 No. 5 May 1999
Inadvertent Receipt of Opponent's Privileged Documents Vol. 5 No. 2 February 1998
Privilege for In-House Investigations Vol. 2 No. 7 July 1995
Production of Documents Vol. 7 No. 12 December 2001
Protecting E-Mail Vol. 2 No. 6 June 1995
Self-Critical Analysis Privilege Vol. 4 No. 11 November 1997
Work Product Vol. 2 No. 4 April 1995
Work Product Vol. 2 No. 4 April 1995
Work Product Privilege Vol. 2 No. 3 March 1995
Work Product Protection Vol. 2 No. 6 June 1995

Procedures
Mandatory Disclosure Vol. 3 No. 1 January 1996

Research
Academic Research Vol. 6 No. 9 September 1999

Rules
Amended Federal Rules of Civil Procedure Vol. 1 No. 2 November 1994
Board of Contract Appeals Vol. 4 No. 6 June 1997
Depositions Vol. 4 No. 7 July 1997
Required Disclosures Vol. 5 No. 9 September 1998

Technology
Computer Generated Evidence Vol. 4 No. 9 September 1997
Forced Production of Computer Databases Vol. 4 No. 11 November 1997
E-Mail Vol. 3 No. 8 August 1996
Electronic Files Vol. 5 No. 7 July 1998
Electronic Production Vol. 3 No. 8 August 1996
Electronic Records Vol. 5 No. 9 September 1998
Hard Drives Vol. 4 No. 4 April 1997

DISPUTES

Alternate Dispute Resolution
ADR Lawyers Vol. 2 No. 8 August 1995
Advocacy Vol. 2 No. 4 April 1995
Subcontractor's Rights Vol. 2 No. 4 April 1995

Arbitration
AAA Panelists Reviewed Vol. 3 No. 4 April 1996
AAA's Rules Revised Vol. 3 No. 5 May 1996
Advocacy in Construction Arbitration Vol. 2 No. 3 March 199
5
American Arbitration Association Vol. 2 No. 10 October 1995
Arbitration Vol. 4 No. 1 January 1997
Arbitration Vol. 4 No. 7 July 1997
Arbitration Vol. 6 No. 8 August 1999
Arbitration - AAA Consolidation Procedures Vol. 4 No. 4 April 1997
Arbitration - Postponements Vol. 5 No. 3 March 1998
Arbitration - Preparing an Award Vol. 5 No. 1 January 1998
Arbitration - Privilege Vol. 4 No. 6 June 1997
Challenging the Arbitration Decision Vol. 2 No. 13 Supplement 199
5
Construction Disputes Unique Vol. 7 No. 1 January 2000
Essential Elements Vol. 3 No. 8 August 1996
Federal Law Preempts State Statute Vol. 2 No. 7 July 1995
Managing Hearings Vol. 3 No. 6 June 1996
Multi-Party Arbitration Clauses Vol. 2 No. 4 April 1995
Resolution Management Vol. 3 No. 2 February 1996

Selecting An Arbitrator Vol. 3 No. 1 January 1996
Subcontracts Vol. 8 No. 3 March 2001
Testimony - Privilege Vol. 1 No. 2 November 1994
Witness Sequestration in Arbitration Vol. 2 No. 10 October 1995

Cardinal Change
Application to Government Contracts Vol. 2 No. 7 July 1995
Determination of Vol. 2 No. 7 July 1995

Case Law
Case Law Vol. 4 No. 5 May 1997
Case Law Vol. 4 No. 6 June 1997
Case Law Vol. 4 No. 7 July 1997
Case Law Vol. 4 No. 8 August 1997
Case Law Vol. 4 No. 10 October 1997

Claims
Case History Vol. 7 No. 12 December 2000

Contracts
FIDIC Contracts Vol. 6 No. 7 July 1999

Costs
Allowability of Consultant Costs Vol. 2 No. 6 June 1995
Allowability of Consultant Costs Vol. 3 No. 6 June 1996
Allowability of Consultant Costs Vol. 3 No. 8 August 1996
Allowability of Consultant Costs Vol. 3 No. 10 October 1996

Experts
Experts Vol. 3 No. 11 November 1996
Experts Vol. 4 No. 2 February 1997
Liability Vol. 7 No. 10 October 2000
Liability Of Vol. 1 No. 3 December 1994
Opinion Evidence Vol. 2 No. 4 April 1995
Preparation for Testimony Vol. 1 No. 1 October 1994
Use of Expert Witness Vol. 1 No. 1 October 1994

International Arbitration
Common Mistakes Vol. 2 No. 11 November 1995
United Kingdom Vol. 5 No. 7 July 1998

Litigation
Experts Vol. 5 No. 1 January 1998

Mediation
Adding Teeth Vol. 3 No. 5 May 1996
Lawyer Mediation Fees Vol. 2 No. 8 August 1995
Litigation & Mediation Vol. 3 No. 6 June 1996
Mediation Vol. 2 No. 3 February 1996
Mediation Vol. 4 No. 2 February 1997
Mediator's Objective Vol. 3 No. 1 January 1996
Mediator's Role Vol. 3 No. 2 February 1996
Selecting The Mediator Vol. 2 No. 1 January 1995
Standards of Conduct Vol. 2 No. 2 February 1995
Standards of Conduct Vol. 2 No. 3 March 1995

Negotiation
Facilitated Negotiation Vol. 2 No. 7 July 1995
Value of Somebody Else's Claim Vol. 2 No. 1 January 1995

Partnering
Arizona Department of Transportation Vol. 2 No. 4 April 1995
Beyond Disputes Vol. 2 No. 7 July 1995
Cost Savings Vol. 2 No. 7 July 1995
Escalating the Disagreement Vol. 1 No. 3 December 1994
Inexperience Construction Owner Vol. 2 No. 11 November 1995
Negotiating Partnership Agreement Vol. 2 No. 11 November 1995
Partnering Vol. 4 No. 5 May 1997
Partnering Projects - Selecting Facilitators Vol. 2 No. 7 July 1995
Preventing Construction Disputes Vol. 2 No. 4 April 1995

Prearbitration Conference
Ask the Arbitrator Vol. 1 No. 2 November 1994

Process
Contract Claims Procedure Vol. 3 No. 2 February 1996
Dispute Review Boards Vol. 3 No. 1 January 1996
Dispute Review Boards Vol. 3 No. 12 December 1996
Managing Construction Disputes Vol. 3 No.11 November 1996

Technical Information
Construction Disputes Vol. 6 No. 4 April 1999

ENGINEERS

Design
Laws Restrict Engineers Ability To Design Vol. 2 No. 5 May 1995

ENVIRONMENT

Financing
Privatizing Cleanup Vol. 8 No. 1 January 2001

ESTIMATING

Projects
Contractor Contingency and Risk Vol. 7 No. 11 November 2000
Remediation Projects Vol. 2 No. 12 December 1995

INSURANCE

A/E
Professional Liability Vol. 3 No. 1 January 1996

Commercial General Liability
Defective Work Vol. 1 No. 1 October 1994
New Construction and Design Policies Vol. 3 No. 12 December 1996
Overruns Not Covered Vol. 2 No. 6 June 1995

Design/Build
Professional Liability Vol. 3 No. 1 January 1996

Insurer
Limitation Period for Claims Against Performance Bonds Vol. 1 No. 1 October 1994

International
London Market Failures Vol. 2 No. 5 May 1995

Power
Market Designers
Power Pays More Vol. 2 No. 4 April 1995

Professional Liability
Claims Made Policies Vol. 2 No. 1 January 1995
Errors and Omission Vol. 2 No. 6 June 1995
Failure to Renew Vol. 2 No. 5 May 1995

Property
Calculating Reconstruction Costs Vol. 2 No. 1 January 1995
Collapse Vol. 3 No. 7 July 1996
Collapse Vol. 3 No. 7 July 1996
Cost Increase - Global Warming Vol. 2 No. 6 June 1995
Dry Rot Vol. 3 No. 7 July 1996
Efficient Proximate Cause Vol. 1 No. 2 November 1994
Unfair Settlement Vol. 8 No. 2 February 2001

Reform
Workers Compensation Vol. 7 No. 10 October 2000
Workers Compensation Reform Vol. 2 No. 13 Supplement 1995

Reinsurance
Reinsurance As A Funding Source Vol. 2 No. 4 April 1995

Subcontractor
General Liability Vol. 8 No. 5 May 2001

Surety
Collecting Delay Damages Vol. 8 No. 5 May 2001
Surety Bonds Vol. 4 No. 1 January 1997

INTERNATIONAL

Construction
China Vol. 4 No. 10 October 1997
Construction Markets Vol. 2 No. 10 October 1995
Construction Markets Vol. 2 No. 13 Supplement 1995
Delays Vol. 2 No. 7 July 1995
European Construction Vol. 3 No. 6 June 1996
Expanding Markets for U.S. Contractors Vol. 3 No. 8 August 1996
French Contractors Vol. 2 No. 8 August 1995
Korea Vol. 1 No. 3 December 1994
United Kingdom Construction Vol. 3 No. 4 April 1996
United Kingdom Construction Summary Vol. 1 No. 2 November 1994

Contracts
FIDIC Contracts Vol. 6 No. 8 August 1999

Contractors
Claims Vol. 4 No. 9 September 1997
Contractors Vol. 4 No. 7 July 1997

Design
International Market: Korea Vol. 1 No. 3 December 1994

Government
Dome Roof Contract Terminated Vol. 4 No. 11 November 1997

International
International Market Vol. 2 No. 12 December 1995

Joint Venture
Picking Joint Venture Partners Vol. 3 No. 3 March 1996

Laws
Turkey - BOT Vol. 2 No. 13 Supplement 1995

Market
Asian Construction Vol. 2 No. 3 March 1995
Business Development Vol. 2 No. 5 May 1995
China Vol. 2 No. 5 May 1995
Far East Construction News Vol. 2 No. 3 March 1995
German Protectionism Vol. 2 No. 5 May 1995
German Protectionism Vol. 2 No. 6 June 1995
Market Vol. 4 No. 3 March 1997
Privatization Vol. 2 No. 5 May 1995
U.K. Construction Contracts and Claims Vol. 2 No. 12 December 1995

United Kingdom
United Kingdom Economic Surveys Vol. 3 No. 10 October 1996

PLANNING

Formwork
Construction and Design Vol. 6 No. 9 September 1999
Formwork Vol. 6 No. 1 January 1999

PROCUREMENT

Marketing
Federal Acquisition Regulations Vol. 2 No. 3 March 1995
Marketing on the Internet Vol. 4 No. 12 December 1997

PRODUCTIVITY

Weather
Effect of Weather and Delivery Vol. 7 No. 1 January 2000

PROJECT ADMINISTRATION

Design
Submittals Vol. 4 No. 1 January 1997

Owners
Owners Vol. 5 No. 6 June 1998

Partnering
After The Workshop Vol. 3 No. 9 September 1996
Two-Tiered Partnering for Environmental Clean-Up Vol. 3 No. 12 December 1996

Project Management
Human Resources Vol. 7 No. 8 August 2000
Net Based Software Vol. 7 No. 9 September 2000
Professionalism Vol. 8 No. 5 May 2001
Project Risk Vol. 7 No. 9 September 2000
Risk Management Vol. 7 No. 9 September 2000

Technology
Photographs Vol. 2 No. 12 December 1995
Technology Vol. 4 No. 1 January 1997
Technology Vol. 5 No. 5 May 1998
Technology-Digital Pictures Vol. 4 No. 3 March 1997

REAL ESTATE

Borrowing
FDIC Procedures Vol. 2 No. 3 March 1995

Construction
Measuring Floor Area Vol. 4 No. 12 December 1997

Conversions
Military Base Closing Vol. 2 No. 2 February 1995

RISK

Damage
Transfer of Risk: No Damage for Delay Clause Vol. 5 No. 4 April 1998

Education
Continuing Education Vol. 5 No. 4 April 1998

Environmental
Coping With Uncertainty Vol. 4 No. 10 October 1997

Factors
Factors Affecting Contractors Vol. 5 No. 2 February 1998

Language
Assessing Lump Sum Contracts Vol. 5 No. 2 February 1998

Process
Analysis of Corporate Risk Vol. 5 No. 4 April 1998

Trends
Perceptions and Trends Vol. 4 No. 6 June 1997

SAFETY

Accidents
Trenching Accidents Vol. 5 No. 1 January 1998

Construction
Involving The Owner Vol. 3 No. 2 February 1996

Controls
Slope, Depth, and Weight Controls Vol. 3 No. 12 December 1996

Management
Managing Safety Programs Vol. 4 No. 3 March 1997

Material
Highways Vol. 3 No. 12 December 1996

OSHA
Lead Exposure Vol. 2 No. 6 June 1995
OSHA Vol. 5 No. 6 June 1998
OSHA Inspections Vol. 6 No. 8 August 1999

Owner
Liability to Independent Contractor's Employees Vol. 3 No. 3 March 1996

Standards
Ladders Vol. 4 No. 3 March 1997
Protecting Flaggers Vol. 3 No. 12 December 1996

SCHEDULING

CPM Schedules
Errors Vol. 4 No. 4 April 1997

Consultant
Using the Scheduling Consultant Vol. 1 No. 3 December 1994

Delays
Measuring Disruption Vol. 7 No. 6 June 2000
Probability for Delay Vol. 6 No. 6 June 1999

Documents
Contract Documents Vol. 5 No. 7 July 1998
Contract Documents Vol. 5 No. 8 August 1998
Under AIA Document A201 Vol. 2 No. 5 May 1995

Early Start Dates
Determining Early Start Dates on Primavera Vol. 2 No. 11 November 1995
Right to Finish Early Vol. 6 No. 3 March 1999

Experts
Scheduling Experts Vol. 2 No. 5 May 1995

Method
Linear Scheduling Method Vol. 2 No. 6 June 1995
Linear Scheduling Method Vol. 3 No. 4 April 1996

Project
Simulation in Project Scheduling Vol. 5 No. 4 April 1998

Schedules
Avoiding Claims Vol. 7 No. 9 September 2000
Contract Documents Vol. 5 No. 8 August 1998
Dynamic Schedules Vol. 8 No. 1 January 2001
Progress Evaluation Vol. 8 No. 3 March 2001
Shadow Schedules Vol. 5 No. 6 June 1998

Software
AutoCAD/Primavera Datalink Vol. 1 No. 2 November 1994
Data Processing Vol. 1 No. 2 November 1994
Identity Crisis Vol. 7 No. 8 August 2000
Integrating Design and Scheduling Programs Vol. 1 No. 2 November 1994
Notes on Microsoft Project for Windows Vol. 5 No. 1 January 1998
Primavera Software Vol. 2 No. 12 December 1995
Resource Controls Vol. 8 No. 2 February 2001

Subcontractors
Subcontractors Vol. 4 No. 7 July 1997

SPECIFICATIONS

Law
Buy American Act Vol. 4 No. 5 May 1997

Subcontractor Claims
Liquidating Agreements Vol. 6 No. 3 March 1999

SURETY

Performance
Completing Work Vol. 8 No. 4 April 2001

Retainage
Reliance on Retainage Vol. 4 No. 11 November 1997

Secrets
Secrets Vol. 6 No. 4 April 1999

TECHNOLOGY

Communication
Communications Vol. 2 No. 7 July
1995
Exploring The Internet Vol. 2 No. 10 October 1995

Computers
Avoiding Data Losses Vol. 2 No. 3 March 1995
Computer Calculations Vol. 2 No. 3 March 1995
Linking Computers Together Vol. 2 No. 2 February 1995
Project Home Page Vol. 4 No. 1 January 1997

Information Network
AGC - Constructor Information Network Vol. 2 No. 2 February 1995
Computer On-Line Networks Vol. 3 No. 2 February 1996

Procurement Network - FACNET Vol. 3 No. 1 January 1996

Project Management
Procurement Management Vol. 8 No. 5 May 2001

Specifications
Concrete Pipe Bedding Vol. 3 No. 8 August 1996

TERMINATION

Convenience
Convenience Vol. 5 No. 3 March 1998
Costs Vol. 7 No. 8 August 2000
Negotiating a Clause Vol. 5 No. 10 October 1998
Termination for Convenience Settlement Expenses Vol. 5 No. 5 May 1998

Default
Failure to Make Progress Vol. 2 No. 12 December 1995
Failure to Make Progress Vol. 6 No. 5 May 1999
Performance to Bonds - Notice of Default Vol. 1 No. 3 December 1994
Right to Cure Vol. 5 No. 3 March 1998
Substantial Delay Vol. 7 No. 8 August 2000
Time To Correct Defective Work Vol. 1 No. 1 October 1994

Privatization
Termination of Concession Vol. 2 No. 13 Supplement 1995

- CCL Construction Consultants, Inc. -
- 4600 College Boulevard, Suite 104 -
- Overland Park, Kansas 66211-1606 USA -
- Tel: 1 (800) 533-8626, Ext. 206 ~ Fax: (913) 491-9469 -
- E-mail  cclcc@ix.netcom.com -