 CUMULATIVE
LISTING OF ARTICLES FROM CCL SUMMARIES 1994 - 2001
Welcome to the CCL Summaries Archives. Articles
summarizing the advances and changes in Technology, Law, Insurance and Accounting that
affect your profession and your business are available upon request. Submit your request
by area of interest.
ACCELERATION
Agreements
Agreements to Accelerate Vol. 5 No. 8 August 1998
Labor Productivity Vol. 7 No. 8 August 2000
ACCOUNTING
Construction
Management Taxability Vol. 2 No. 6 June 1995
Contractors
New Programs Vol. 2 No. 2 February 1995
Financial Conditions
Evaluating Conditions Vol. 3 No. 5 May 1996
Market
Design Vol. 1 No. 1 October 1994
BIDDING
Business
Disadvantage Business Enterprises Vol. 4 No. 6 June
1997
Model
Bidding Model for Bid Preparation Vol. 5 No. 4 April 1998
Protests
Payment for Contractors Who Proceed Vol. 5 No. 5 May 1998
CHANGES
Agreements
Administration Vol. 7 No. 3 March 2000
Liquidating Agreements Vol. 5 No. 12 December 1998
Oral Modifications Vol. 7 No. 6 June 2000
Unilateral Modifications Vol. 7 No. 6 June 2000
Written Changes Vol. 8 No. 4 April 2001
Disruptions
Calculating Disruptions Vol. 5 No. 12 December 1998
Project
Cardinal Changes Vol. 8 No. 4 April 2001
Cumulative Impact Vol. 7 No. 6 June 2000
Effect on Budget and Schedule Vol. 4 No. 9 September 1997
Effect of Multiple Changes Vol. 7 No. 1 January 2000
Termination
Termination for Convenience Vol. 5 No. 12 December 1998
CHANGE ORDERS
Authority
Releases Vol. 7 No. 2 February 2000
Changes
DCAA Audit Manual Revisions Vol. 6 No. 1 January 1999
Cardinal Changes Vol. 6 No. 2 February 1999
Commercial
Commercial Impracticability Vol. 6 No. 2 February 1999
Construction
Avoiding Vol. 5 No. 5 May 1998
Change Control System Vol. 3 No. 6 June 1996
Cost of Change Vol. 3 No. 2 February 1996
Effect on Productivity Vol. 3 No. 9 September 1996
Setting Aside A Modification Vol. 3 No. 6 June 1996
Costs
Accord and Satisfaction Vol. 7 No. 10 October 2000
Change Order Markup Vol. 6 No. 1 January 1999
Overhead Vol. 5 No. 7 July 1998
Sovereign Immunity Vol. 7 No. 9 September 2000
Special Time Cards for Additional Costs Vol. 6 No. 1 January 1999
Delay
Cumulative Delay Claims Vol. 3 No. 9 September 1996
Duress Vol. 7 No. 9 September 2000
Oral Agreements at Time of Change Order Vol. 4 No. 9 September 1997
Economy
Economic Duress Vol. 6 No. 3 March 1999
Government
Funding Vol. 4 No.4 April 1997
Multiple
Too Many Changes Vol. 5 No. 7 July 1998
Payment
Change Orders Vol. 8 No. 1 January 2001
Performance
Recordkeeping Vol. 6 No. 3 March 1999
Productivity
Effect on Productivity Vol. 5 No. 6 June 1998
Project Administration
Change Order Management Systems Vol. 3 No. 5 May 1996
Termination
Practical Advice Federal Govt. Convenience Clause Vol. 5 No. 2 February 1998
Termination Expenses Vol. 6 No. 1 January 1999
Termination or Modification? Vol. 5 No. 1 January 1998
CLAIMS
Construction
Differing Site Conditions Vol. 4 No. 6 June 1997
Differing Site Conditions Vol. 7 No. 10 October 2000
Differing Site Conditions Vol. 7 No. 12 December 2000
Differing Site Conditions Vol. 8 No. 3 March 2001
Contractor
Assignment Vol. 7 No. 10 October 2000
Contractor - False Claims Vol. 4 No. 5 May 1997
False Certification Vol. 3 No. 3 March 1996
False Claims Vol. 4 No. 7 July 1997
False Claims Vol. 5 No. 9 September 1998
False Claims Act Vol. 4 No. 3 March 1997
Silence is the Best Report Vol. 5 No. 4 April 1998
Time to Submit a Claim Vol. 8 No. 3 March 2001
Costs
Allowability of Consultant Costs Vol. 2 No. 6 June 1995
Costs of Borrowing Vol. 5 No. 3 March 1998
Overhead Vol. 5 No. 7 July 1998
Disruption
Cumulative Impact Vol. 4 No. 8 August 1997
False Claims
False Claims Vol. 6 No. 3 March 1999
Law
False Claims Vol. 3 No. 6 June 1996
Lien Vol. 7 No. 11 November 2000
Notice Vol. 7 No. 3 March 2000
Notice - Owner's Bad Faith Vol. 5 No. 4 April 1998
Multiple
Multiple Vol. 5 No. 7 July 1998
Productivity
Labor Productivity Vol. 3 No. 9 September 1996
Lost Productivity Vol. 7 No. 5 May 2000
Specifications
Defective Vol. 3 No. 4 April 1996
Subcontractor
Extra Work Vol. 8 No. 5 May 2001
CONSTRUCTION
Change Orders
Change Orders Release Not Preclude Additional Claim Vol. 3 No. 10 October 1996
Claims
Claims Vol. 6 No. 4 April 1999
Differing Site Conditions Vol. 3 No. 10 October 1996
Differing Site Conditions Vol. 5 No. 1
January 1998
Construction Contracts
Environmental Vol. 5 No. 9 September 1998
Construction Management
Contractor Warranty Vol. 2 No. 8 August 1995
Marketing CM Services Vol. 2 No. 7 July 1995
Professional Service Vol. 2 No. 6 June 1995
Contractors
A New Roadblock to Claims Vol. 2 No. 10 October 1995
Acquisition or Merger Vol. 2 No. 13 Supplement 1995
Affirmative Action Vol. 2 No. 8 August 1995
Affirmative Action Vol. 3 No. 5 May 1996
Affirmative Action Vol. 5 No. 4 April 1998
Building Codes Vol. 2 No. 8 August 1995
CAD's Accuracy Vol. 2 No. 7 July 1995
CFMA 1994 Construction Industry Survey Vol. 2 No. 1 January 1995
Design/Build Vol. 2 No. 8 August 1995
Determining Impact Before the Change Vol. 2 No. 10 October 1995
Managing Change Notices - Nice Guys Finish Last Vol. 2 No. 4 April 1995
Negotiated Procurement Vol. 3 No. 11 November 1996
New Ways to Determine Time to Perform Vol. 2 No. 11 November 1995
Profitability Vol. 2 No. 1 January 1995
Risk - Allocation of Risk Vol. 4 No. 5 May 1997
Risk Management Vol. 8 No. 1 January 2001
Subcontracts Vol. 4 No. 2 February 1997
Withholding Subcontractor Payment Vol. 8
No. 2 February 2001
Worker's Compensation Vol. 7 No. 6 June 2000
Contracts
A201 (1997) Vol. 5 No. 3 March 1998
Sovereign Immunity Vol. 3 No. 12 December 1996
Costs
Cost Estimates Vol. 8 No. 4 April 2001
Costs of Borrowing Vol. 5 No. 3 March 1998
Inflationary Cost Increases in '93-'94 Vol. 1 No. 1 October 1994
Polyvinyl Chloride (PVC) Vol. 1 No. 1 October 1994
Environment
Cold and Hot Weather Concrete Vol. 5 No. 4 April 1998
Insurance Risk Vol. 2 No. 4 April 1995
Insurance Risk Vol. 3 No. 7 July 1996
Lender Liability - Hazardous Waste Vol. 4 No. 2 February 1997
New Water Regulations Vol. 2 No. 3 March 1995
Winter Concrete Vol. 5 No. 3 March 1998
Equipment
Buy or Lease? Vol. 2 No. 2 February 1995
Crane Selection Vol. 2 No. 3 March 1995
Prefabrication for Multi-Stories Vol. 3 No. 2 February 1996
Financing
Fund Administration Vol. 8 No. 4 April 2001
Lender's Liability for Progress Payments Vol. 2 No. 8 August 1995
Public-Private Financing Vol. 2 No. 10 October 1995
Future
Construction Predictions Vol. 3 No. 1 January 1996
Predictions for 1995 Vol. 2 No. 13 Supplement 1995
Hospitals
Health Care Reform Delays New Construction Vol. 1 No. 3 December 1994
Housing
Construction Market Vol. 2 No. 3 March 1995
Privatized Housing Vol. 8
No. 2 February 2001
International
Asia's Power Market Vol. 2 No. 12 December 1995
Global Building Vol. 2 No. 2 February 1995
Growth Vol. 2 No. 1 January 1995
International Market Vol. 3 No. 11 November 1996
International Merger Vol. 2 No. 2 February 1995
New Products
Fiber-Reinforced Glulam Vol. 1 No. 1 October 1994
Owners
Selecting Project Delivery System Vol. 3 No. 4 April 1996
Selecting the Contractor Vol. 2 No. 1 January 1995
Subcontractors - DBE Set Asides Vol. 2 No. 4 April 1995
Termination - Subcontractors Vol. 2 No. 8 August 1995
Planning
Excavation: Directional Boring Vol. 2 No. 4 April 1995
Formwork Vol. 1 No. 1 October 1994
Formwork Vol. 2 No. 4 April 1995
Risk Assessment Vol. 3 No. 10 October 1996
Project Administration
Contractor Selection/Designer Selection Vol. 3 No. 4 April 1996
Labor Shortages Vol. 2 No. 3 March 1995
Welder Shortages Vol. 2 No. 6 June 1995
Projects
Seven Oaks Dam Vol. 3 No. 2 February 1996
Requirements
Buried Utilities Vol. 7 No. 12 December 2000
New Steel Erection Standards Vol. 8 No. 4 April 2001
Submittal Approval Vol. 8 No. 4 April 2001
Technology Centers Vol. 2 No. 12 December 1995
Safety
Crumbling Bridges in the U.S Vol. 3 No. 1 January 1996
Highway Work Zones Vol. 2 No. 7 July 1995
Profit Vol. 2 No. 6 June 1995
Radar Transmitters Vol. 2 No. 7 July 1995
Safety Programs Vol. 2 No. 6 June 1995
Sources
Risk - Classification and Sources Vol.
4 No. 2 February 1997
CONSTRUCTION MANAGEMENT
Liability
CM Liability Vol. 6 No. 3 March 1999
Modifications
Authority to Modify Trade Contracts Vol. 7 No. 4 April 2000
Web Sites Vol. 7 No. 10 October 2000
CONTRACTS
Agreement
Incorporation By Reference Vol. 3 No. 11 November 1996
Clauses
Pay If Paid Clauses Vol. 3 No. 6 June 1996
Pay If Paid Clause Unenforceable Vol. 5
No. 4 April 1998
Time is of the Essence Vol. 8 No. 3 March 2001
Compensation
Contractor Compensation Vol. 6 No. 3 March 1999
Contractor Compensation Vol. 6 No. 4 April 1999
Contractor Compensation Vol. 6 No. 5 May 1999
Contractor Compensation Vol. 6 No. 6 June 1999
Contractor Compensation Vol. 6 No. 7 July 1999
Damages
Mutual Waiver of Consequential Damages Vol. 5 No. 3 March 1998
Default
Performance Bonds - Notice of Default Vol. 1 No. 3
December 1994
Design
AIA B141 Vol. 5 No. 5 May 1998
Construction/Design - New AIA Form Vol. 4 No. 6 June 1997
Design/Build Vol. 2 No. 10 October 1995
Hold Harmless Agreements Vol. 2 No. 1 January 1995
New FIDIC Subcontractor Form Vol. 2 No. 6 June 1995
Government
Government Contracts Decisions Vol. 4 No. 9
September 1997
Government Subcontracts Vol. 6 No. 9 September 1999
Guides
Design/Build Vol. 2 No. 4 April 1995
Interpretation
Interpretation Vol. 6 No. 4 April 1999
Performance
Contractor Compensation Vol. 6 No. 9 September 1999
Subcontractors
New AGC Subcontract Form Vol. 1 No. 3 December 1994
DAMAGES
Calculations
Eichleay Formula Vol. 1 No. 1 October 1994
Eichleay Formula Vol. 3 No. 2 February 1996
Eichleay Formula Vol. 3 No. 8 August 1996
Eichleay Formula Vol. 5 No. 6 June 1998
Costs
Proving Labor Costs Vol. 8 No. 2 February 2001
Cost Control
Additional Costs Vol. 7 No. 11 November 2000
Lost Productivity Vol. 4 No. 4 April 1997
Delays
Eichleay Formula Vol. 7 No. 11 November 2000
Home Office Overhead Vol. 4 No. 5 May 1997
Economy
Economic Loss - Other Property Vol. 4 No. 4 April 1997
Prejudgment Interest
Court Ruling Saves Interest Vol. 2 No. 4 April 1995
Project Management
Lost Productivity Vol. 4 No. 8 August 1997
Recovery
Owner Cannot Recover Liquidated and Actual Vol. 3 No. 4 April 1996
Recovering Attorney Fees Vol. 3 No. 3 March 1996
Recovering Attorney Fees and Interest Vol. 3 No. 1 January 1996
DEFECTS
Arbitration
Home Buyer's Warranty Vol. 3 No. 12 December 1996
Homeowners Warranty Arbitration Vol. 2 No. 13 Supplement 1995
Scope of Agreement Vol. 8 No. 3 March
2001
Associations
Homeowner's Associations Unique Characteristics Vol. 2 No. 4 April 1995
Bonds
Surety's Obligation To Investigate Defects Vol. 2 No. 9 September 1995
Calculation of Damages
Diminutive Value Vol. 2 No. 6 June 1995
Causes of Construction Defects Vol. 2 No. 9 September 1995
Dry Rot Vol. 5 No. 5 May 1998
Labor Shortages Vol. 2 No. 6 June 1995
Maintenance or Defect? Vol. 2 No. 9 September 1995
Need To Disclose Off-Site Conditions Vol. 2 No. 9 September 1995
Roof Leaks Vol. 2 No. 2 February 1995
Scupper Construction Vol. 2 No. 12 December 1995
Sick Building Vol. 7 No. 3 March 2000
Sick Building Syndrome Vol. 2 No. 3 March 1995
Sick Building Syndrome Vol. 7 No. 6 June 2000
Sick Building Syndrome Vol. 7 No. 11 November 2000
Weather Protection Vol. 2 No. 9 September 1995
Claims
Cause v. Symptom Vol. 1 No. 3 December 1994
Defect Claims to Increase Vol. 2 No. 9 September 1995
Denying Contractor Claims Vol. 8 No. 2 February 2001
Insurance Vol. 1 No. 2 November 1994
Statutes of Repose Vol. 4 No. 3 March 1997
Vinyl Tile Vol. 1 No. 3 December 1994
Warranty Vol. 1 No. 3 December 1994
Codes
City's Enforcement of Building Codes Vol. 2 No. 9 September 1995
Concrete
Concrete Vol. 6 No. 10 October 1999
Post Tensioned Concrete Slabs Vol. 6 No. 3 March 1999
Post Tensioned Slabs Vol. 7 No. 11 November 2000
Stone Veneer Slabs Vol. 5 No. 2 February 1998
Testing for Defects Vol. 2 No. 2 February 1995
Testing for Defects Vol. 2 No. 7 July 1995
Concrete Cracks
Calcium Chloride Vol. 2 No. 3 March 1995
Damages
Damages for Emotional Distress Vol. 7 No. 3 March 2000
Damage to Other Property Vol. 5 No. 12 December 1998
Damage to Other Property Vol. 6 No. 1 January 1999
Storm Damage Vol. 3 No. 12 December 1996
Design
Lateral Support Vol. 7 No. 2 February 2000
Masonry Failure Vol. 6 No. 4 April 1999
Documents
Claim Documents Vol. 2 No. 3 March 1995
Incorporation Doctrine Vol. 5 No. 6 June
1998
Experts
Proving Designer Malpractice Vol. 3 No. 7 July 1996
Government
Latent Defects Vol. 5 No. 2 February 1998
Latent Defects Vol. 5 No. 12 December 1998
Guide
Guide To Defect Claims and Litigation Vol. 2 No. 9 September 1995
Homeowner's Warranty
Receivership Vol. 2 No. 2 February 1995
Roof Leaks Vol. 7 No. 12 December 2000
Inspection
Independent Inspection and Concealed Defects Vol. 5 No. 11 November 1998
Insurance
Additional Insured Endorsements Vol. 8 No. 3 March 2001
CGL Insurance Vol. 6 No. 5 May 1999
CGL Insurance Coverage Vol. 6 No. 6 June 1999
CGL Insurers Share Continuous Loss Vol. 2 No. 9 September 1995
Commercial General Liability Insurance Vol. 3 No. 9 September 1996
Insurance Vol. 5 No. 12 December 1998
Insurance Vol. 8 No. 1 January 2001
Insurance Coverage Vol. 8 No. 2 February 2001
Insurance to Correct Vol. 5 No. 9 September 1998
Insurance to Pay For Corrections Vol. 4 No. 2 February 1997
Insurance to Pay For Repairs Vol. 4 No.
1 January 1997
Latent Defects
Latent Defects Vol. 6 No. 2 February 1999
Time to Claim Vol. 7 No. 10 October 2000
Legislation
New California Community Association Law Vol. 3 No. 1 January 1996
New Defect Legislation - Bad for Association? Vol. 2 No. 10 October 1995
New Defect Legislation - Good for Association? Vol. 2 No. 10 October 1995
Proposed California Legislation Vol. 3 No. 5 May 1996
Time Limits on Lawsuits Vol. 3 No. 7 July 1996
Liability
Building Inspectors Vol. 3 No. 11 November 1996
Contractor Warrants Designer's Defective Plans Vol. 2 No. 9 September 1995
Designer Liability Vol. 3 No. 10 October 1996
Designers Liable for Contractor's Defective Work Vol. 2 No. 9 September 1995
Engineer Liable To Contractor Vol. 2 No. 9 September 1995
Homebuilders Strictly Liable For Defects Vol. 2 No. 1 January 1995
Lender Liability Vol. 6 No. 8 August 1999
Liability for Inspection Vol. 6 No. 1 January 1999
Real Estate Broker Liability Vol. 2 No. 5 May 1995
Supplier Liability Vol. 7 No. 10 October
2000
Limitations
of Actions: Statutes of Repose Vol. 2 No. 9 September 1995
on Actions Measured from Final Completion Vol. 2 No. 8 August 1995
Statute of Limitations Vol. 4 No. 1
January 1997
Statute of Limitations Vol. 7 No. 5 May 2000
Statute of Repose Vol. 8 No. 5 May 2001
Litigation
Avoiding Litigation Vol. 6 No. 5 May 1999
Buyers Knowledge of Defect Litigation Vol. 4 No. 12 December 1997
Case Management Orders Vol. 3 No. 7 July 1996
Forensic Investigation Vol. 4 No. 11
November 1997
Incorporation Doctrine Vol. 5 No. 6 June 1998
Reserve Study Requirements Vol. 4 No. 12 December 1997
Materials
EIFS Vol. 3 No. 9 September 1996
EIFS Systems Vol. 3 No. 7 July 1996
EIFS Systems Vol. 3 No. 7 July 1996
EIFS Systems Vol. 3 No. 11 November 1996
Indoor Air Quality Vol. 3 No. 11 November 1996
Indoor Air Quality Vol. 4 No. 3 March 1997
Polybutlylene Pipe Vol. 3 No. 2 February 1996
Polybutlylene Pipe Vol. 2 No. 12 December 1995
Polybutlylene Pipe Vol. 5 No. 4 April 1998
Wood Siding Vol. 2 No. 11 November 1995
Measuring
Measuring Reinforcing Steel Corrosion Vol. 2 No. 13 Supplement 1995
Owner Damages
Betterment Vol. 3 No. 2 February 1996
Cost of Replacement Vol. 3 No. 3 March 1996
Owner Damages Vol. 7 No. 3 March 2000
Subsequent Owners Vol. 7 No. 6 June 2000
Prevention
Defect Prevention in Shear Wall Construction Vol. 3 No. 3 March 1996
Quality
Designer Quality Vol. 2 No. 11 November 1995
Indoor Air Quality Vol. 6 No. 7 July 1999
Indoor Air Quality Defects Vol. 2 No. 9 September 1995
Quality of Work Vol. 2 No. 13 Supplement 1995
Quality Control
Avoiding - Quality Control Vol. 2 No. 5 May 1995
Remedy
Fraud Vol. 6 No. 6 June 1999
Repair
Epoxy Adhesives Vol. 2 No. 2 February 1995
Foundation Wall Repair Vol. 2 No. 4 April 1995
Observing Repairs Vol. 8 No. 2 February 2001
Reconstruction Vol. 2 No. 6 June 1995
Wood
Wood Floor Deflection Vol. 2 No. 9 September 1995
DELAYS
Cardinal Changes
Re-negotiating Contract Price Vol. 2 No. 2 February 1995
Changes
Claims-Schedule Analysis Vol. 4 No. 12 December 1997
Claims
CPM Inappropriate for Multiple Room Project Vol. 1 No. 2 November 1994
Claims-Eichleay Formula Vol. 4 No. 2 February 1997
Collapsed As-Built Vol. 3 No. 6 June 1996
Computer Evidence Vol. 3 No. 3 March 1996
Contractor Duration Vol. 8 No. 1 January 2001
Eichleay Formula Vol. 2 No. 5 May 1995
Eichleay Formula Vol. 3 No. 5 May 1996
Eichleay Formula Vol. 3 No. 10 October 1996
Eichleay Formula Vol. 3 No. 11 November 1996
Eichleay Formula Vol. 4 No. 9 September 1997
Eichleay Formula Vol. 6 No. 4 April 1999
Eichleay Formula Vol. 7 No. 5 May 2000
Eichleay Formula Vol. 7 No. 11 November 2000
Export Examination Vol. 7 No. 2 February 2000
Home Office Overhead Vol. 7 No. 12 December 2000
Liability Vol. 7 No. 11 November 2000
Network Schedules to Prove Delay Vol. 1 No. 1 October 1994
Notice Vol. 7 No. 12 December 2000
Schedule Evaluation Vol. 7 No. 2 February 2000
Starting Work Vol. 8 No. 5 May 2001
Subcontractor Responsibility for Delay Vol. 1 No. 3 December 1994
Sureties Vol. 3 No. 11 November 1996
Weather Vol. 7 No. 3 March 2000
Concurrent
Apportioning Concurrent Delays Vol. 3 No. 8 August 1996
Concurrent Delay Vol. 7 No. 8 August
2000
Concurrent Delay Vol. 7 No. 9 September 2000
Concurrent Delay Vol. 8 No. 2 February 2001
Costs
Bid Protests Vol. 3 No. 4 April 1996
Cost Escalation Vol. 7 No. 12 December 2000
Delay Costs Under Payment Bond Vol. 3 No. 4 April 1996
Lost Profits Vol. 6 No. 9 September 1999
Exceptions
No Damage For Delay Vol. 3 No. 3 March 1996
International
English Power Plants Vol. 2 No. 10 October 1995
U.K. Claims Vol. 4 No. 12 December 1997
London Underground Vol. 5 No. 11 November 1998
Liability
Liquidated Damages Vol. 7 No. 9 September 2000
Payment Bond Vol. 6 No. 2 February 1999
Methods
Claims Vol. 8 No. 5 May 2001
Comparing Delay Analysis Methods Vol. 7 No. 1 January 2000
Measurement Vol. 7 No. 9 September 2000
Measuring Delay Vol. 4 No. 6 June 1997
Proving Delay Vol. 7 No. 10 October 2000
Responsibility Vol. 7 No. 9 September 2000
Overhead
Home Office Overhead Vol. 6 No. 1 January 1999
Home Office Overhead Vol. 6 No. 7 July 1999
Home Office Overhead Vol. 6 No. 8 August 1999
Recovery
Claims Against the Surety Vol. 4 No. 10 October 1997
Lost Productivity Vol. 6 No. 8 August 1999
Time Only Provision No Bar to Delay Damages Vol. 4 No. 3 March 1997
Specifications
Defective Cardinal Change Vol. 2 No. 4 April 1995
Sureties
Claims - Sureties Vol. 4 No. 2 February 1997
DESIGN
Beams
Bending Stiffness of Wood Beams Vol. 2
No. 11 November 1995
Building Codes
Earthquake Results to Change Seismic Design in Building Codes Vol. 1 No. 1 October 1994
Building Codes Vol. 8 No. 4 April 2001
Building Collapse - Northridge Earthquake Vol. 2 No. 2 February 1995
CAD
CAD Drawings Vol. 2 No. 12 December 1995
Four Dimensional Modeling Vol. 2 No. 7 July 1995
Computer Software
3D Modeling Vol. 2 No. 13 Supplement 1995
Computer Systems
Automation Vol. 2 No. 8 August 1995
Concrete
Protecting Concrete From Corrosion Vol. 2 No. 10 October 1995
Reinforced Concrete Beams Vol. 2 No. 7 July 1995
Constructability
Americans With Disabilities Act Vol. 3 No. 4 April 1996
Americans With Disabilities Act Vol. 4 No. 11 November 1997
Americans With Disabilities Act Vol. 5 No. 5 May 1998
Americans With Disabilities Act Vol. 5 No. 6 June 1998
Americans With Disabilities Act Vol. 5 No. 11 November 1998
Americans With Disabilities Act Vol. 7 No. 12 December 2000
Human Habitation or Use Vol. 2 No. 12 December 1995
Construction Management
Architects Vol. 2 No. 3 March 1995
Contractors
Statute of Limitations Vol. 2 No. 12 December 1995
Contracts
Contracts for Design Services Vol. 2 No. 11 November 1995
Statute of Limitations Vol. 2 No. 12 December 1995
Design/Build
1996 AIA Standard Form Design-Build Agreements Vol. 3 No. 12 December 1996
Designer License Vol. 3 No. 12 December 1996
Incentive Contracts Vol. 3 No. 12 December 1996
Indemnity Agreements Vol. 3 No. 9 September 1996
Joint Venture Contracts Vol. 3 No. 10 October 1996
Practice Manual Vol. 3 No. 11 November 1996
Proposed Exceptions to Federal Rule Vol. 3 No. 12 December 1996
Public Agencies Vol. 2 No. 4 April 1995
State Laws Vol. 3 No. 9 September 1996
State and Local Law Vol. 3 No. 11 November 1996
Total Incentive Contracts Vol. 3 No. 9 September 1996
Highways
Need to Consult Traffic Engineer Vol. 2 No. 5 May 1995
Road Pavements Vol. 3 No. 1 January 1996
International
Waste and Water Market Vol. 2 No. 1 January 1995
Law
Certificate of Merit Laws Vol. 4 No. 12 December 1997
New Federal Law Vol. 3 No. 4 April 1996
Measurement
Metric - U.S. Conversion Vol. 2 No. 3 March 1995
Methods
Reinforced Concrete Beam Deflection Vol. 1 No. 2 November 1994
New Products
Cardboard Vol. 4 No. 3 March 1997
Innovative Designs Vol. 7 No. 6 June 2000
Innovative Steel Deck Vol. 2 No. 2 February 1995
Moisture Protection Vol. 1 No. 2 November 1994
Panel
Panel Use Vol. 2 No. 7 July 1995
Project Administration
Moisture Protection - Weather Envelope Vol. 1 No. 3 December 1994
Reinforcing Steel
Rust Resistant Re-Bar Vol. 2 No. 5 May 1995
Review
Designers Operations Review Vol. 2 No. 7 July 1995
Review Electronic Stamps Vol. 5 No. 6
June 1998
Roof Sheets
Wind Pulls Sheets From Fasteners Vol. 2 No. 6 June 1995
Safety
Zero Accident Culture Vol. 2 No. 7 July 1995
Seismic Design
Columns Design Vol. 3 No. 5 May 1996
Hospitals Vol. 2 No. 10 October 1995
Structural Panels
Plywood or OSB? Vol. 2 No. 2 February 1995
Structure
Bridges Vol. 4 No. 7 July 1997
Termination
Terminating the Design Contract Vol. 5 No. 10 October 1998
Trend
Silent Trend Vol. 3 No. 3 March 1996
DESIGN/BUILD
Agreements
Teaming Agreements Vol. 6 No. 9 September 1999
Change Orders
Change Orders Vol. 4 No. 12 December 1997
No Written Change Orders Vol. 5 No. 11 November 1998
Claims
Joint Venture Claims Vol. 6 No. 8 August 1999
Construction
Risk Vol. 4 No. 9 September 1997
Contracts
Authority to Contract Vol. 6 No. 6 June 1999
Contracts Vol. 5 No. 7 July 1998
Contracts Vol. 5 No. 9 September 1998
Form Contracts Vol. 7 No. 2 February 2000
GMP - Innovative Projects Vol. 4 No. 6 June 1997
Costs
Compared Vol. 6 No. 2 February 1999
Reimbursable Costs Vol. 5 No. 8 August 1998
Engineers
How to Lead Design/Build Teams Vol. 5 No. 4 April 1998
Government
Federal Selection Vol. 5 No. 8 August 1998
Government Contractor Defense Vol. 4 No. 10 October 1997
Increased Federal Projects Vol. 5 No. 5 May 1998
Laws
Procurement Vol. 4 No. 3 March 1997
State Surveys Vol. 4 No. 1 January 1997
Lenders
Lenders Obligation to Fund Vol. 5 No. 10 October 1998
Liability
Designer Liability Vol. 4 No. 5 May 1997
Lump Sum Liability Vol. 5 No. 12 December 1998
Methods
Problems Vol. 4 No. 7 July 1997
Volumetric Building Technique Vol. 5 No. 1 January 1998
Ownership
Design Ownership Vol. 5 No. 10 October 1998
Proposals
Bid Protests Vol. 4 No. 11 November 1997
Request for Proposals Vol. 4 No. 3 March 1997
Successful Case History Vol. 5 No. 2 February 1998
Specifications
Scope of Work Vol. 5 No. 11 November 1998
Specifications Vol. 5 No. 8 August 1998
Trade Secrets
Trade Secrets Vol. 5 No. 10 October 1998
DESIGNER
Arbitration
No Arbitration for Professional Negligence Vol. 3 No. 11 November 1996
Architect
Americans With Disabilities Act Vol. 3 No. 12 December 1996
Americans With Disabilities Act Vol. 4 No. 3 March 1997
Americans With Disabilities Act Vol. 4 No. 4 April 1997
Americans With Disabilities Act Vol. 5 No. 1 January 1998
Americans With Disabilities Act Vol. 5 No. 4 April 1998
Architect as Builder Vol. 2 No. 7 July 1995
Caps
Overhead Vol. 3 No. 2 February 1996
Change Orders
Designer's Change Orders Vol. 2 No. 8 August 1995
Claims
Claims Against Vol. 5 No. 3 March 1998
Claims By ... Vol. 4 No. 3 March 1997
Entitlement To Offset Vol. 7 No. 12 December 2000
Communication
Implied Obligation Vol. 7 No. 1 January 2000
Importance of Communication Vol. 2 No. 5 May 1995
Construction
Construction Safety Vol. 3 No. 11 November 1996
Marketing Forecast Vol. 3 No. 6 June 1996
Contracts Vol. 4 No. 1 January 1997
Contractors
Project Administration - Terminating
Contractors Vol. 4 No. 8 August 1997
Project Administration - Terminating Contractors Vol. 4 No. 9 September 1997
Contracts
Contracts Vol. 3 No. 1 January 1996
Designer Contracts Vol. 2 No. 10 October 1995
Copyrights
Design Copyright Vol. 5 No. 8 August 1998
Design/Build
Advantages Vol. 3 No. 8 August 1996
Federal Government Projects Vol. 3 No. 8 August 1996
Project Performance Vol. 3 No. 8 August 1996
Reimburse Unsuccessful Offerers? Vol. 3 No. 8 August 1996
Designs
Delegating Design to the Contractor Vol. 5 No. 11 November 1998
Reusing Designs Vol. 4 No. 9 September 1997
Reusing Designs Vol. 4 No. 10 October 1997
Documentation
Certified Pay Requests Vol. 7 No. 3 March 2000
Project Administration Vol. 1 No. 1 October 1994
Recordkeeping Vol. 7 No. 5 May 2000
Draftsmen
Unauthorized Engineering Practice Vol. 8 No. 2 February 2001
Engineers
Engineers Cannot Design for Habitation or Occupancy Vol. 2 No. 4 April 1995
Insurance
Standard of Care Vol. 7 No. 4 April 2000
International
International Market Vol. 2 No. 13 Supplement 1995
Lawsuits
Avoiding Professional Liability Lawsuits Vol. 2 No. 2 February 1995
Contractor's Lawsuits Vol. 3 No. 2 February 1996
Legal
Indemnification Vol. 2 No. 8 August 1995
Ownership of Design Vol. 3 No. 1 January 1996
Liability
Architect Liability Vol. 7 No. 10 October 2000
Dismissal With Prejudice Vol. 7 No. 10 October 2000
Liability Claims Against Vol. 1 No. 3 December 1994
Liability for Differing Site Conditions Vol. 7 No. 4 April 2000
Liability for Negligence Vol. 7 No. 1 January 2000
Liability for Site Visits Vol. 7 No. 5 May 2000
Liability for Unauthorized Changes Vol. 2 No. 3 March 1995
Liability to Third Parties Vol. 4 No. 2 February 1997
Limitation of Liability Vol. 4 No. 1 January 1997
Limitation of Liability Vol. 4 No. 2 February 1997
Limitation of Liability Clauses Vol. 3 No. 12 December 1996
Limiting Liability Vol. 2 No. 8 August 1995
Litigation
Litigation - Experts Vol. 5 No. 1 January 1998
Management
Insurance Costs Vol. 3 No. 2 February 1996
Insurance Costs Vol. 3 No. 7 July 1996
Insurance Costs Vol. 5 No. 4 April 1998
Management Insurance Cost Vol. 4 No. 4 April 1997
Risk Management Vol. 6 No. 2 February 1999
Small Firm Organization Vol. 3 No. 3 March 1996
Marketing
Billings Vol. 3 No.6 June 1996
Project Administration
Liability Claims Against Vol. 1 No. 3 December 1994
Making A Decision Vol. 1 No. 2 November 1994
Program Management Vol. 3 No. 12 December 1996
Project Administration - Failure to Make a
Decision Vol. 4 No. 12 December 1997
Review
Constructability Design and Specification Review Vol. 2 No. 3 March 1995
Safety
Construction Site Safety: Whose Job is it Anyway? Vol. 5 No. 5 May 1998
Liability for Safety Vol. 7 No. 1 January 2000
Site Safety - Rights, Risks & Responsibilities Vol. 5 No. 5 May 1998
Selection
Selecting Designers Vol. 2 No. 8 August 1995
Top 500
Marketing Vol. 2 No. 13 Supplement 1995
DISCOVERY
Alternate Dispute Resolution
ADR Documents Vol. 2 No. 10 October 1995
Arbitration
Arbitration Vol. 5 No. 7 July 1998
Arbitrator Power To Order Depositions Vol. 2 No. 10 October 1995
Discovery Vol. 2 No. 1 January 1995
Discovery Vol. 2 No. 2 February 1995
Billing
Attorney Billing Records Vol. 6 No. 8 August 1999
Freedom of Information Act Vol. 7 No. 5 May 2000
Experts
Court Appointed Experts Vol. 7 No. 8 August 2000
Damage Experts Vol. 2 No. 5 May 1995
Deposing an Expert Vol. 4 No. 10 October 1997
Deposing Owners Attorney Vol. 7 No. 12 December 2000
Expert Opinions Vol. 8 No. 2 February 2001
Expert Reports Vol. 3 No. 10 October 1996
Expert Testimony Vol. 5 No. 8 August
1998
Legal
Abuse Vol. 4 No. 8 August 1997
ADR Discovery Under the Freedom of Information Act Vol. 2 No. 11 November 1995
Contentious Discovery Vol. 2 No. 11 November 1995
Reform Vol. 2 No. 5 May 1995
Litigation
Document Imaging Vol. 1 No. 3 December 1994
Expert Discovery in Government Litigation Vol. 5 No. 11 November 1998
Litigation Support Systems Vol. 3 No. 6 June 1996
Nonparty
Evidence From Nonparties Vol. 6 No. 7
July 1999
Nonparty Discovery Vol. 4 No. 12 December 1997
Party
Interviewing Party Employees Vol. 5 No. 6 June 1998
Privilege
E-Mail Vol. 3 No. 9 September 1996
Executive Privilege Vol. 6 No. 5 May 1999
Inadvertent Receipt of Opponent's Privileged Documents Vol. 5 No. 2 February 1998
Privilege for In-House Investigations Vol. 2 No. 7 July 1995
Production of Documents Vol. 7 No. 12 December 2001
Protecting E-Mail Vol. 2 No. 6 June 1995
Self-Critical Analysis Privilege Vol. 4 No. 11 November 1997
Work Product Vol. 2 No. 4 April 1995
Work Product Vol. 2 No. 4 April 1995
Work Product Privilege Vol. 2 No. 3 March 1995
Work Product Protection Vol. 2 No. 6 June 1995
Procedures
Mandatory Disclosure Vol. 3 No. 1 January 1996
Research
Academic Research Vol. 6 No. 9 September 1999
Rules
Amended Federal Rules of Civil Procedure Vol. 1 No. 2 November 1994
Board of Contract Appeals Vol. 4 No. 6 June 1997
Depositions Vol. 4 No. 7 July 1997
Required Disclosures Vol. 5 No. 9 September 1998
Technology
Computer Generated Evidence Vol. 4 No. 9 September 1997
Forced Production of Computer Databases Vol. 4 No. 11 November 1997
E-Mail Vol. 3 No. 8 August 1996
Electronic Files Vol. 5 No. 7 July 1998
Electronic Production Vol. 3 No. 8 August 1996
Electronic Records Vol. 5 No. 9 September 1998
Hard Drives Vol. 4 No. 4 April 1997
DISPUTES
Alternate Dispute Resolution
ADR Lawyers Vol. 2 No. 8 August 1995
Advocacy Vol. 2 No. 4 April 1995
Subcontractor's Rights Vol. 2 No. 4 April 1995
Arbitration
AAA Panelists Reviewed Vol. 3 No. 4 April 1996
AAA's Rules Revised Vol. 3 No. 5 May 1996
Advocacy in Construction Arbitration Vol. 2 No. 3 March 1995
American Arbitration Association Vol. 2 No. 10
October 1995
Arbitration Vol. 4 No. 1 January 1997
Arbitration Vol. 4 No. 7 July 1997
Arbitration Vol. 6 No. 8 August 1999
Arbitration - AAA Consolidation Procedures Vol. 4 No. 4 April 1997
Arbitration - Postponements Vol. 5 No. 3 March 1998
Arbitration - Preparing an Award Vol. 5 No. 1 January 1998
Arbitration - Privilege Vol. 4 No. 6 June 1997
Challenging the Arbitration Decision Vol. 2 No. 13 Supplement 1995
Construction Disputes Unique Vol. 7 No. 1 January
2000
Essential Elements Vol. 3 No. 8 August 1996
Federal Law Preempts State Statute Vol. 2 No. 7 July 1995
Managing Hearings Vol. 3 No. 6 June 1996
Multi-Party Arbitration Clauses Vol. 2 No. 4 April 1995
Resolution Management Vol. 3 No. 2 February 1996
Selecting An Arbitrator Vol. 3 No. 1 January
1996
Subcontracts Vol. 8 No. 3 March 2001
Testimony - Privilege Vol. 1 No. 2 November 1994
Witness Sequestration in Arbitration Vol. 2 No. 10 October 1995
Cardinal Change
Application to Government Contracts Vol. 2 No. 7 July 1995
Determination of Vol. 2 No. 7 July 1995
Case Law
Case Law Vol. 4 No. 5 May 1997
Case Law Vol. 4 No. 6 June 1997
Case Law Vol. 4 No. 7 July 1997
Case Law Vol. 4 No. 8 August 1997
Case Law Vol. 4 No. 10 October 1997
Claims
Case History Vol. 7 No. 12 December 2000
Contracts
FIDIC Contracts Vol. 6 No. 7 July 1999
Costs
Allowability of Consultant Costs Vol. 2 No. 6 June 1995
Allowability of Consultant Costs Vol. 3 No. 6 June 1996
Allowability of Consultant Costs Vol. 3 No. 8 August 1996
Allowability of Consultant Costs Vol. 3 No. 10 October 1996
Experts
Experts Vol. 3 No. 11 November 1996
Experts Vol. 4 No. 2 February 1997
Liability Vol. 7 No. 10 October 2000
Liability Of Vol. 1 No. 3 December 1994
Opinion Evidence Vol. 2 No. 4 April 1995
Preparation for Testimony Vol. 1 No. 1 October 1994
Use of Expert Witness Vol. 1 No. 1 October 1994
International Arbitration
Common Mistakes Vol. 2 No. 11 November 1995
United Kingdom Vol. 5 No. 7 July 1998
Litigation
Experts Vol. 5 No. 1 January 1998
Mediation
Adding Teeth Vol. 3 No. 5 May 1996
Lawyer Mediation Fees Vol. 2 No. 8 August 1995
Litigation & Mediation Vol. 3 No. 6 June 1996
Mediation Vol. 2 No. 3 February 1996
Mediation Vol. 4 No. 2 February 1997
Mediator's Objective Vol. 3 No. 1 January 1996
Mediator's Role Vol. 3 No. 2 February 1996
Selecting The Mediator Vol. 2 No. 1 January 1995
Standards of Conduct Vol. 2 No. 2 February 1995
Standards of Conduct Vol. 2 No. 3 March 1995
Negotiation
Facilitated Negotiation Vol. 2 No. 7 July 1995
Value of Somebody Else's Claim Vol. 2 No. 1 January 1995
Partnering
Arizona Department of Transportation Vol. 2 No. 4 April 1995
Beyond Disputes Vol. 2 No. 7 July 1995
Cost Savings Vol. 2 No. 7 July 1995
Escalating the Disagreement Vol. 1 No. 3 December 1994
Inexperience Construction Owner Vol. 2 No. 11 November 1995
Negotiating Partnership Agreement Vol. 2 No. 11 November 1995
Partnering Vol. 4 No. 5 May 1997
Partnering Projects - Selecting Facilitators Vol. 2 No. 7 July 1995
Preventing Construction Disputes Vol. 2 No. 4 April 1995
Prearbitration Conference
Ask the Arbitrator Vol. 1 No. 2 November 1994
Process
Contract Claims Procedure Vol. 3 No. 2 February 1996
Dispute Review Boards Vol. 3 No. 1 January 1996
Dispute Review Boards Vol. 3 No. 12 December 1996
Managing Construction Disputes Vol. 3 No.11 November 1996
Technical Information
Construction Disputes Vol. 6 No. 4 April 1999
ENGINEERS
Design
Laws Restrict Engineers Ability To Design Vol. 2 No. 5 May 1995
ENVIRONMENT
Financing
Privatizing Cleanup Vol. 8 No. 1 January 2001
ESTIMATING
Projects
Contractor Contingency and Risk Vol. 7 No. 11 November 2000
Remediation Projects Vol. 2 No. 12 December 1995
INSURANCE
A/E
Professional Liability Vol. 3 No. 1 January 1996
Commercial General Liability
Defective Work Vol. 1 No. 1 October 1994
New Construction and Design Policies Vol. 3 No. 12 December 1996
Overruns Not Covered Vol. 2 No. 6 June 1995
Design/Build
Professional Liability Vol. 3 No. 1 January 1996
Insurer
Limitation Period for Claims Against Performance Bonds Vol. 1 No. 1 October 1994
International
London Market Failures Vol. 2 No. 5 May 1995
Power
Market Designers
Power Pays More Vol. 2 No. 4 April 1995
Professional Liability
Claims Made Policies Vol. 2 No. 1 January 1995
Errors and Omission Vol. 2 No. 6 June 1995
Failure to Renew Vol. 2 No. 5 May 1995
Property
Calculating Reconstruction Costs Vol. 2 No. 1 January 1995
Collapse Vol. 3 No. 7 July 1996
Collapse Vol. 3 No. 7 July 1996
Cost Increase - Global Warming Vol. 2 No. 6 June 1995
Dry Rot Vol. 3 No. 7 July 1996
Efficient Proximate Cause Vol. 1 No. 2 November 1994
Unfair Settlement Vol. 8 No. 2 February
2001
Reform
Workers Compensation Vol. 7 No. 10 October 2000
Workers Compensation Reform Vol. 2 No. 13 Supplement 1995
Reinsurance
Reinsurance As A Funding Source Vol. 2 No. 4 April 1995
Subcontractor
General Liability Vol. 8 No. 5 May 2001
Surety
Collecting Delay Damages Vol. 8 No. 5 May 2001
Surety Bonds Vol. 4 No. 1 January 1997
INTERNATIONAL
Construction
China Vol. 4 No. 10 October 1997
Construction Markets Vol. 2 No. 10 October 1995
Construction Markets Vol. 2 No. 13 Supplement 1995
Delays Vol. 2 No. 7 July 1995
European Construction Vol. 3 No. 6 June 1996
Expanding Markets for U.S. Contractors Vol. 3 No. 8 August 1996
French Contractors Vol. 2 No. 8 August 1995
Korea Vol. 1 No. 3 December 1994
United Kingdom Construction Vol. 3 No. 4 April 1996
United Kingdom Construction Summary Vol. 1 No. 2 November 1994
Contracts
FIDIC Contracts Vol. 6 No. 8 August 1999
Contractors
Claims Vol. 4 No. 9 September 1997
Contractors Vol. 4 No. 7 July 1997
Design
International Market: Korea Vol. 1 No. 3 December 1994
Government
Dome Roof Contract Terminated Vol. 4
No. 11 November 1997
International
International Market Vol. 2 No. 12 December 1995
Joint Venture
Picking Joint Venture Partners Vol. 3 No. 3 March 1996
Laws
Turkey - BOT Vol. 2 No. 13 Supplement 1995
Market
Asian Construction Vol. 2 No. 3 March 1995
Business Development Vol. 2 No. 5 May 1995
China Vol. 2 No. 5 May 1995
Far East Construction News Vol. 2 No. 3 March 1995
German Protectionism Vol. 2 No. 5 May 1995
German Protectionism Vol. 2 No. 6 June 1995
Market Vol. 4 No. 3 March 1997
Privatization Vol. 2 No. 5 May 1995
U.K. Construction Contracts and Claims Vol. 2 No. 12 December 1995
United Kingdom
United Kingdom Economic Surveys Vol. 3 No. 10 October 1996
PLANNING
Formwork
Construction and Design Vol. 6 No. 9 September 1999
Formwork Vol. 6 No. 1 January 1999
PROCUREMENT
Marketing
Federal Acquisition Regulations Vol. 2 No. 3 March 1995
Marketing on the Internet Vol. 4 No. 12
December 1997
PRODUCTIVITY
Weather
Effect of Weather and Delivery Vol. 7 No. 1 January 2000
PROJECT
ADMINISTRATION
Design
Submittals Vol. 4 No. 1 January 1997
Owners
Owners Vol. 5 No. 6 June 1998
Partnering
After The Workshop Vol. 3 No. 9 September 1996
Two-Tiered Partnering for Environmental Clean-Up Vol. 3 No. 12 December 1996
Project Management
Human Resources Vol. 7 No. 8 August 2000
Net Based Software Vol. 7 No. 9 September 2000
Professionalism Vol. 8 No. 5 May 2001
Project Risk Vol. 7 No. 9 September 2000
Risk Management Vol. 7 No. 9 September 2000
Technology
Photographs Vol. 2 No. 12 December 1995
Technology Vol. 4 No. 1 January 1997
Technology Vol. 5 No. 5 May 1998
Technology-Digital Pictures Vol. 4 No. 3 March 1997
REAL ESTATE
Borrowing
FDIC Procedures Vol. 2 No. 3 March 1995
Construction
Measuring Floor Area Vol. 4 No. 12 December 1997
Conversions
Military Base Closing Vol. 2 No. 2 February 1995
RISK
Damage
Transfer of Risk: No Damage for Delay Clause Vol. 5 No. 4 April 1998
Education
Continuing Education Vol. 5 No. 4 April 1998
Environmental
Coping With Uncertainty Vol. 4 No. 10 October 1997
Factors
Factors Affecting Contractors Vol. 5 No. 2 February 1998
Language
Assessing Lump Sum Contracts Vol. 5 No. 2 February 1998
Process
Analysis of Corporate Risk Vol. 5 No. 4 April 1998
Trends
Perceptions and Trends Vol. 4 No. 6 June 1997
SAFETY
Accidents
Trenching Accidents Vol. 5 No. 1 January 1998
Construction
Involving The Owner Vol. 3 No. 2 February 1996
Controls
Slope, Depth, and Weight Controls Vol. 3 No. 12 December 1996
Management
Managing Safety Programs Vol. 4 No. 3 March 1997
Material
Highways Vol. 3 No. 12 December 1996
OSHA
Lead Exposure Vol. 2 No. 6 June 1995
OSHA Vol. 5 No. 6 June 1998
OSHA Inspections Vol. 6 No. 8 August 1999
Owner
Liability to Independent Contractor's Employees Vol. 3 No. 3 March 1996
Standards
Ladders Vol. 4 No. 3 March 1997
Protecting Flaggers Vol. 3 No. 12 December 1996
SCHEDULING
CPM Schedules
Errors Vol. 4 No. 4 April 1997
Consultant
Using the Scheduling Consultant Vol. 1 No. 3 December 1994
Delays
Measuring Disruption Vol. 7 No. 6 June 2000
Probability for Delay Vol. 6 No. 6 June 1999
Documents
Contract Documents Vol. 5 No. 7 July 1998
Contract Documents Vol. 5 No. 8 August 1998
Under AIA Document A201 Vol. 2 No. 5 May 1995
Early Start Dates
Determining Early Start Dates on Primavera Vol. 2 No. 11 November 1995
Right to Finish Early Vol. 6 No. 3 March
1999
Experts
Scheduling Experts Vol. 2 No. 5 May 1995
Method
Linear Scheduling Method Vol. 2 No. 6 June 1995
Linear Scheduling Method Vol. 3 No. 4 April 1996
Project
Simulation in Project Scheduling Vol. 5 No. 4 April 1998
Schedules
Avoiding Claims Vol. 7 No. 9 September 2000
Contract Documents Vol. 5 No. 8 August 1998
Dynamic Schedules Vol. 8 No. 1 January 2001
Progress Evaluation Vol. 8 No. 3 March 2001
Shadow Schedules Vol. 5 No. 6 June 1998
Software
AutoCAD/Primavera Datalink Vol. 1 No. 2 November 1994
Data Processing Vol. 1 No. 2 November 1994
Identity Crisis Vol. 7 No. 8 August 2000
Integrating Design and Scheduling Programs Vol. 1 No. 2 November 1994
Notes on Microsoft Project for Windows Vol. 5 No. 1 January 1998
Primavera Software Vol. 2 No. 12 December 1995
Resource Controls Vol. 8 No. 2 February
2001
Subcontractors
Subcontractors Vol.
4 No. 7 July 1997
SPECIFICATIONS
Law
Buy American Act Vol. 4 No. 5 May 1997
Subcontractor Claims
Liquidating Agreements Vol. 6 No. 3 March 1999
SURETY
Performance
Completing Work Vol. 8 No. 4 April 2001
Retainage
Reliance on Retainage Vol. 4 No. 11 November 1997
Secrets
Secrets Vol. 6 No. 4 April 1999
TECHNOLOGY
Communication
Communications Vol. 2 No. 7 July 1995
Exploring The Internet Vol. 2 No. 10 October 1995
Computers
Avoiding Data Losses Vol. 2 No. 3 March 1995
Computer Calculations Vol. 2 No. 3 March 1995
Linking Computers Together Vol. 2 No. 2 February 1995
Project Home Page Vol. 4 No. 1 January 1997
Information Network
AGC - Constructor Information Network Vol. 2 No. 2 February 1995
Computer On-Line Networks Vol. 3 No. 2 February 1996
Procurement Network - FACNET Vol. 3 No. 1
January 1996
Project Management
Procurement Management Vol. 8 No. 5 May 2001
Specifications
Concrete Pipe Bedding Vol. 3 No. 8 August 1996
TERMINATION
Convenience
Convenience Vol. 5 No. 3 March 1998
Costs Vol. 7 No. 8 August 2000
Negotiating a Clause Vol. 5 No. 10 October 1998
Termination for Convenience Settlement Expenses Vol. 5 No. 5 May 1998
Default
Failure to Make Progress Vol. 2 No. 12 December 1995
Failure to Make Progress Vol. 6 No. 5 May 1999
Performance to Bonds - Notice of Default Vol. 1 No. 3 December 1994
Right to Cure Vol. 5 No. 3 March 1998
Substantial Delay Vol. 7 No. 8 August 2000
Time To Correct Defective Work Vol. 1 No. 1 October 1994
Privatization
Termination of Concession Vol. 2 No. 13 Supplement 1995 |